5
en
Fig. 3-17
Fig. 3-18
• For right bottom piping
(1) Attach the piping by following the procedure for right and right rear piping (4)
to (5).
(2) Connect I-shape connection pipe
H
, and tighten the nuts with two spanners.
(Flare nut tightening torque is 68 N·m to 82 N·m) (Fig. 3-17)
(3) The remaining steps are the same as steps (7), (8) and (9) for the right and
right rear piping work.
3. Installing the indoor unit
H
B
B
H
RH79A016H01_en.indd 5
2019/07/22 10:11:17
007