35
OCH715
35
DISASSEMBLY PROCEDURE
10
PKFY-P04NLMU-E.TH
PKFY-P06NLMU-E.TH
PKFY-P08NLMU-E.TH
PKFY-P12NLMU-E.TH
PKFY-P15NLMU-E.TH
PKFY-P18NLMU-E.TH
PHOTOS/FIGURES
OPERATION PROCEDURE
1. REMOVING THE PANEL
(1) Insert the driver to the hole at VANE LOWER shaft and
slide the VANE LOWER shaft (2 places each).
Push VANE
UPPER shaft with the driver.
(2) Pull the VANE LOWER and VANE UPPER from unit.
(3) Remove 2 screw caps of the front panel. Remove 2
screws. (See Photo 1)
(4) Hold the lower part of both ends of the front panel and pull
it slightly toward you, and then remove the front panel by
pushing it upward.
(5) Remove the screw of the corner box. (See Photo 1)
Remove the corner box.
2. REMOVING THE ELECTRICAL BOX
(1) Remove the panel and the corner box. (Refer procedure to 1)
(2) Remove the front and side electrical box covers (each 2
screw). (See Photo 2)
(3) Disconnect the connectors below.
CNMF : For fan motor
CN44 : For indoor piping (2 phase pipe and liquid pipe)
CN60 : For LEV
(4) Disconnect the connectors below.
CN2M : For transmission
CND : For power supply
CN2A : For MA-remote controller
(5) Disconnect the connector for ground wire.
(6) Remove the screw on lower side of the electrical box.
(See Photo 3)
(7) Push up the upper fixture catch to remove the box, then
remove it from the box fixture.
Photo 2
Photo 1
Screws and screw caps
Screw of the
corner box
Front panel
Photo 3
Water cover
Screw of
electrical box
cover (side)
Screw of electrical box cover
(Front)
Hook
VANE LOWER shaft
VANE LOWER
Screw of electrical
box cover (side)
Connect for ground
Fixture
Electrical box
Screw of
electrical box
Be careful when removing heavy parts.
NOTE: Turn OFF the power supply before assembly.
VANE UPPER shaft
VANE UPPER
Unlock the stopper and remove the horizontal vanes
using following tool like a screw driver.
Unlock
Unlock
: Indicates the visible parts in the photos/figures.
: Indicates the invisible parts in the photos/figures.