
2
GB
D
F
SW
I
NL
E
P
[Fig. 2.0.1]
A
B
B
C
C
A
Air outlet
B
Remote controller
C
Joint pipe for R407C (Field piping connection)
* In case of PEH-RP200 only
2
3
200
530
131
200
199
32
20
PEH-RP250: 1440
PEH-RP200: 1240
20
200
400
730
75
25
928
428
500
1
2
3
A
A
C
D
B
B
PEH-RP250: 1480
PEH-RP200: 1280
PEH-RP250: 2080 PEH-RP200: 1880
1
When connecting air inlet
2
When installing the suspension fixtures prior to installation of the
indoor unit without inlet duct
3
When hanging the indoor unit directly without inlet duct
A
Service space
B
Suspension bolt pitch
C
Air inlet
D
Air outlet
[Fig. 3.2.1]
F
G
H
A
B
D
C
E
E
4
4.1
A
Ceiling board
B
Edge beam
C
Tie beam
D
Square timber for hanging the air conditioner
E
Pitch
F
Insert: 100 to 150 kg (1 piece) (field supply)
G
M10 hanging bolt (field supply)
H
Reinforcement
[Fig. 4.1.1]
[Fig. 4.1.2]
3.2
[Fig. 3.2.2]
20
199
200
562
131
22
C
D
B
B
F
G
H
E
I
PEH-RP250: 1580
PEH-RP200: 1380
PEH-RP250: 1480
PEH-RP200: 1280
E
Top of the unit
F
4-ø12 suspension bolt holes
G
Control box
H
Drain pan
I
Main body
5
5.1
A
30
B
A
B
A
*1
A
30
B
10
A
A
B
[Fig. 5.1.1]
[Fig. 5.1.2]
[Fig. 5.1.3]
A
Unit body
B
Lifting machine
A
Nut
B
Washer
A
Be sure to attach a U-shaped washer (4 wash-
ers in total).