14
GB
D
F
SW
I
NL
E
P
Noise level of outdoor unit
Model
PUH-P200MYA PUH-P250MYA
Noise level dB(A)
56
57
8. Specifications
Voltage
3N~ V
Power source
Frequency
Hz
kW
Cooling capacity*1
kcal/h
kW
Heating capacity*1
kcal/h
Height
mm
Dimension
Width
mm
Depth
mm
Net weight
kg
Airflow rate
m
3
/min
Fan
External static pressure*2
Pa
Noise level
dB(A)
PEH-P500MYA
380, 400, 415
50
52.0
44,800
61.0
52,400
706
1,993
865
212
170
150, 160, 180
60, 60, 60
PEH-P400MYA
380, 400, 415
50
41.8
36,000
47.4
40,800
706
1,690
865
180
140
150, 170, 180
54, 55, 55
Item
Model
Notes: *1 Refer to the product nameplate attached to the unit for the electrical specifications.
*2 Rating conditions (cooling) Indoor: 27°C DB, 19°C WB
Outdoor: 35°C DB
*3 Rating conditions (heating) Indoor: 20°C DB
Outdoor: 7°C DB, 6°C DB
Operating range
Units should be installed by licensed electric contractor accordingly to local code requirement.
7. Installation and transferring works, and checking
Regarding place for installation
Consult with your dealer for details on installation and transferring the installation.
Caution:
Never install the air conditioner where there is a risk of leakage of flammable
gas.
If gas leaks and accumulates around the unit, fire can result.
Never install the air conditioner at the following place:
•
where there is much machine oil
•
near ocean and beach areas where there is much salt
•
where humidity is high
•
where there are hot springs nearby
•
where there is much sulfureted gas
•
where there is a high-frequency processing machinery (a high-frequency welder,
etc.)
•
where acid solution is frequently used
•
where special sprays are frequently used
•
Install the indoor unit horizontally. Otherwise, water leakage can result.
•
Take sufficient measures against noise when installing the air conditioners at
hospitals or communication-related businesses.
If the air conditioner is used in any of the above-mentioned environments, frequent
operational failure can be expected. It is advisable to avoid these types of installa-
tion sites.
For further details, consult with your dealer.
Regarding electrical work
Caution:
•
The electrical work must be undertaken by a person who is qualified as
an electric engineer according to the [technical standard respecting elec-
trical installation], [internal wiring rules], and the installation instruction
manual with the absolute use of exclusive circuits. The use of other prod-
ucts with the power source can result in burnt-out beakers and fuses.
•
Never connect the grounding wire to a gas pipe, water pipe, arrester, or
telephone grounding wire. For details, consult with your dealer.
•
In some types of installation sites, the installation of an earth leakage
breaker is mandatory. For details, consult with your dealer.
Regarding transfer of installation
•
When removing and reinstalling the air conditioner when you enlarge your
home, remodel, or move, consult with your dealer in advance to ascertain the
cost of the professional engineering work required for transferring the installa-
tion.
Caution:
When moving or reinstalling the air conditioner, consult with your dealer.
Defective installation can result in electric shock, fire, etc.
Regarding noise
•
In installing work, choose a place that can fully bear the weight of the air con-
ditioner, and where noise and vibration can be reduced.
•
Choose a place where cool or warm air and noise from the outdoor air outlet of
the air conditioner do not inconvenience the neighbours.
•
If any alien object is placed near the outdoor air outlet of the air conditioner,
decreased performance and increased noise can result. Avoid placing any
obstacles adjacent to the air outlet.
•
If the air conditioner produces any abnormal sound, consult with your dealer.
Maintenance and inspection
•
If the air conditioner is used throughout several seasons, the insides can get
dirty, reducing the performance.
Depending upon the conditions of usage, foul odors can be generated and
drainage can deteriorate due to dust and dirt, etc.
Cooling
Heating
Maximum
Minimum
Maximum
Minimum
Indoor air intake temperature
32°C DB, 23°C WB
21°C DB, 15°C WB
27°C DB
20°C DB
Outdoor air intake temperature
46°C DB
–5°C DB
24°C DB, 18°C WB
–11°C DB, –12°C WB
Summary of Contents for PEH-P400
Page 16: ......