OPERATING PROCEDURE
PHOTOS/FIGURES
5.
Removing the LEV assy
(1) Remove the controller cover. (See Photo 1)
(2) Remove the under panel. (See Photo 1)
(3) Remove 8 the insulations, then remove 9 pipe cover fix
-
ing screws (4 x 10). (See Photo 2-1)
(4) Loosen the side clamps, then disconnect the LEV con
-
nectors on the controller board.
(5) Remove the earth lead wires from the LEV assy.
(6) Pull out the lead wires through the hole to the controller
board side.
<Removing the header assy>
(6) Cut the band which fixes the header assy and LEV assy
together, then remove the rubber mount. (See Photo 3)
(7) Remove the header assy. (See Photo 5-1)
<Disassembling the pipe box>
(8) Remove 2 side panel fixing screws (4 x 10).
(See Photo 5-1)
(9) Pull out the pipe box (top) and separate it from the side
panel. (See Photo 5-2)
(10) Turn the pipe box (top) upside down. (See Photo 5-3).
(11)
Remove 5 insulations, then remove 5 pipe box (top)
fixing screws (4 x 10).
(12) Turn the pipe box (top) upside down again, facing the
pipe side up.
(13)
Separate the pipe box (center) from the pipe box (top).
(See Photo 5-4.)
(14)
Remove the LEV assy.
<Pipe box cap only for PAC-MK34BC>
The pipe box caps are placed in 2 unused pipe holes
between the pipe box top, center and under.
(See Photo 5-5)
Photo 5-1
Photo 5-2
Photo 5-4
Photo 5-3
Photo 5-5
Pipe box (center)
Insulations (15 x 15 x 35)
Pipe box
(top)
Pipe box caps
Pipe box (top) fixing screws
Side panel
Side panel fixing screws
LEV assy
Pipe box (top)
Earth lead wire
26
OCH744
Summary of Contents for PAC-MK34BC
Page 27: ...27 OCH744 ...