OPERATING PROCEDURE
PHOTOS/FIGURES
3.
Removing the LEV coil (LEV-A–E*)
(1) Remove the controller cover. (See Photo 1)
(2) Remove the under cover. (See Photo 1)
(3) Remove 8 insulations, then remove 9 pipe cover fixing
screws (4 x 10). (See Photo 2-1)
(4) Cut the bands that fixes the lead wire, then pull out the
LEV coil(s) (LEV-A –E*). (See Photo 3)
(5) Loosen the insulation sheet which bundles the LEV lead
wires.
(6) Loosen the side clamps, then disconnect the connector(s)
on the controller board.
(7) Pull out the lead wire(s) through the hole to the controller
board side.
(See Photo 2-2 or 2-3)
*LEV-A–C for PAC-MK34BC (See Photo 2-3)
Photo 3
4.
Removing the controller board
(1) Remove the controller cover. (See Photo 1)
(2) Loosen the side clamps, then disconnect the connectors
on the controller board.
(3) Pick an upper edge of the controller board, then pull for
-
ward. The controller board is fixed to the controller board
holder with 4 hooks. (See Photo 4)
(4) Remove the controller board from the controller board
holder.
Photo 4
LEV coils
Bands
Bands
Hooks
Controller board holder
Header assy
LEV assy
Rubber mount
Controller board
Insulation sheet
OCH744
25
Summary of Contents for PAC-MK34BC
Page 27: ...27 OCH744 ...