63
OPERATING PROCEDURE
PHOTOS
1. Removing the compressor
(1)Remove the screws of the top panel, and remove the top
panel.
(2)Remove the screws of the service panel, and remove the ser-
vice panel.
Recover refrigerant gas.
(3)Remove the screws of the front panel, and remove the front
panel.
(4)Remove the screws of the rear panel, and remove the rear
panel.
(5)Disconnect the compressor lead wire from terminal of
compressor (U, V, W).
(6)Disconnect the outdoor electronic control P.C. board
connectors:
CN661, CN663, CN681, CN791, CN792, CN793, CN796,
CN931, CN932
Disconnect the noise filter P.C. board connector:
CN912
(7)Remove the screws of the electrical parts, and remove the
electrical parts.
(8)Remove the propeller.
(9)Remove the screws of the separator, and remove the
separator.
(10)Remove the sound proof felt.
(11)Detach the welded parts of the compressor suction and dis-
charge pipes (Photo 4).
(12)Remove the compressor nuts and remove the compressor.
Photo 1
Photo 2
12-3. MXZ-3A30NA -
OUTDOOR UNIT
1
Photo 3
Screws of the top panel
Screws of the top panel
Screws of
the side panel
Screws of
the front panel
Screws of
service
panel
Screws of
the service panel
Screws of rear panel
Screws of the electrical parts
Photo 4
Discharge pipe
welded part
Suction pipe
welded part
OB444B--3.qxp 07.4.17 1:40 PM Page 63
Summary of Contents for MXZ-2A20NA-1
Page 15: ...15 WIRING DIAGRAM 6 MXZ 2A20NA OB444B 1 qxp 07 4 17 4 27 PM Page 15 ...
Page 16: ...16 MXZ 2A20NA 1 OB444B 1 qxp 07 4 17 4 28 PM Page 16 ...
Page 17: ...17 MXZ 3A30NA OB444B 1 qxp 07 4 17 4 28 PM Page 17 ...
Page 18: ...18 MXZ 3A30NA 1 OB444B 1 qxp 07 4 17 4 28 PM Page 18 ...