![Mitsubishi Electric MS-09SN-C1 Service Manual Download Page 45](http://html.mh-extra.com/html/mitsubishi-electric/ms-09sn-c1/ms-09sn-c1_service-manual_1810344045.webp)
45
OPERATING PROCEDURE
PHOTOS
Photo 3
Photo 4
Screw of the
heat exchanger
Catch
Bearing support
screws
Heat exchanger
Photo 5
3. Removing the electrical box
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical cover.
(3) Disconnect the connector of the indoor coil thermistor.
(4) Disconnect the motor connector (CN211 and CN121) and
the vane motor connector (CN151) on the electronic con-
trol P.C. board.
(5) Remove the screw of the electrical box, remove the electri-
cal box.
Screws
of the
vane
motor
Vane motor
4. Removing the vane motor
(1) Remove the front panel. (Refer to 1)
(2) Remove the electrical box. (Refer to 3)
(3) Pull out the drain hose from the nozzle assembly, remove
the nozzle assembly.
(4) Remove the screws (both upper and lower) of the vane
motor, disconnect the connector.
(5) Remove the vane motor.
5. Removing the indoor fan motor and the line flow fan
(1) Remove the front panel.
(2) Remove the electrical box.
(3) Unhook the catches on the both sides of the nozzle
assembly.
(4) Remove the nozzle assembly.
(5) Remove the screws of the bearing support.
(6) Remove the screw of the heat exchanger unhook the catch.
(7) Lifting the heat exchanger, remove the bearing support.
(8) Loose the screw fixing the line flow fan, remove the line
flow fan.
(9) Remove the screws of the motor band, remove the fan
motor.
Screw of the
ground wire
Screw of the
electrical cover
Screw of the
electrical cover
Indoor fan motor
Line flow fan
Screw of the
motor band
Screws
of the
motor
band
OB256-2qxp 2.2.8 9:11 AM Page 45
Summary of Contents for MS-09SN-C1
Page 59: ......