5 - 1 5 - 1
MELSEC-Q
5 PROCEDURES BEFORE SYSTEM OPERATION
5. PROCEDURES BEFORE SYSTEM OPERATION
5.1 Procedures before Operation
The procedure for newly connecting QJ71PB92D to an existing PROFIBUS-DP
network is explained below.
For the operation of GX Configurator-DP, refer to the PROFIBUS-DP configuration
operating manual.
Set the PLC CPU to STOP
This is a hardware problem, so contact the
nearest Mitsubishi Electric dealer and explain
the symptoms to the dealer
Start
Set QJ71PB92D to the Self-diagnosis mode (MODE 2) using
GX Configurator-DP.
Yes
No
Is there an error with
self-diagnosis?
The QJ71PB92D starts self-diagnosis
Set QJ71PB92D to the Normal service mode (MODE 0) or
Extended service mode (MODE E) using GX Configurator-DP
Start the communication using GX Configurator-DP
Whether READY LED is ON or
RSP ERR LED is OFF
Ready complete
1 Refer to Chapter 5.1.1.
Set parameters using GX Configurator-DP 1
Is the automatic refresh used?
Reset the PLC CPU
Yes
No
5