[6. Schedule Function of MEHITS CH & HP ]
6.
Schedule Function of MEHITS CH & HP
AE-200, AE-50 and EW-50 have a weekly (5 kinds), annual and daily scheduling function.
[1] Outline
AE-200/AE-50
AE-200/AE-50/EW-50 Web
Schedule setting
Setting on AE-200/AE-50
Setting on Web monitoring PC
Weekly schedule
No. of operation per day: 24 times
Operation items:
ON/OFF, set temperature, operation mode
Time setting unit: 1 minute
Operation subjects:
Group
Pattern:
5 different schedule settings can be made.
Each schedule can have time period.
(Weekly 1, Weekly 2, Weekly 3, Weekly 4, Weekly 5)
* Operation settings can be made separately such as “Set temperature only” or “Operation mode only”.
Annual schedule
Possible to set for a maximum of 50 days and up to 24 months including the current month
No. of pattern: 5 patterns
Today schedule
Today schedule can be changed without changing the weekly schedules or the annual schedules.
(1) What is the weekly schedule?
This term refers to the operation schedule of each day of the week.
(2) What is the seasonal schedule?
5 sets of weekly schedules (Weekly 1, Weekly 2, Weekly 3, Weekly 4, Weekly 5) can be set, and each can be designated
its scheduled term.
(3) What is the annual schedule?
In addition to the weekly schedule, for special days (national holidays, summer vacation, and etc.) a different schedule
can be set for a maximum of 50 days up to 24 months (including the current month) in advance.
During the days set in the annual schedule, the weekly schedule settings will not be performed while the schedule set in
the annual schedule will be performed.
(4) What is today’s schedule?
After setting the weekly and annual schedules, today’s schedule can be used for sudden changes in the regular schedule.
When today’s schedule is set, the weekly and annual schedule settings will not be performed.
However, from the following day, operations will resume according to the weekly and annual schedules settings.