12
GB
D
F
E
I
NL
P
GR
RU
TR
CZ
SV
SL
HG
PO
A
B
ODø25.4 [1]
<Front piping and bottom post-pipting> (sold separately)
(Unit: mm [in])
2
4
6
8
1
2
3
4
5
6
7
8
9
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1pc.
1
3
5
7
9
ODø9.52 [3/8]
IDø12.7 [1/2]
ODø19.05 [3/4]
IDø25.4 [1]
ODø22.2 [7/8]
IDø25.4 [1]
ODø22.2 [7/8]
IDø28.58 [1-1/8]
IDø28.58 [1-1/8]
ODø28.58 [1-1/8]
ODø12.7 [1/2]
IDø9.52 [3/8]
IDø25.4 [1]
P72 (CMY-YS100UEB)
P96 (CMY-YS200UEB)
P120 (CMY-YS300UEB)
P144 (CMY-YS400UEB)
IDø9.52 [3/8]
ODø9.52 [3/8]
IDø12.7 [1/2]
ODø12.7 [1/2]
<gas side>
<liquid side>
<gas side>
<gas side>
<liquid side>
<gas side>
<liquid side>
<gas side>
<liquid side>
[Fig. 10.2.3]
A
Example of closure materials (field-supplied)
B
Fill the gap at the site
Make sure to seal-off the space around
areas where the wires and refrigerant
pipes enter the unit to ensure that small
animals, rainwater, or snow cannot enter
the unit through such openings and cause
damage to the unit.
Caution:
Make sure to seal-off the openings for the pipe and wire retrieval.
•
Small animals, rainwater, or snow entering through the openings may
cause damage to the device.
•
After evacuation and refrigerant charging, ensure that the handle is fully open.
If operating with the valve closed, abnormal pressure will be imparted to the
high- or low-pressure side of the refrigerant circuit, giving damage to the com-
pressor, four-way valve, etc.
•
Determine the amount of additional refrigerant charge by using the formula,
and charge refrigerant additionally through the service port after completing
piping connection work.
•
After completing work, tighten the service port and cap securely so as not to
generate any gas leakage. (Refer to the table on the below for appropriate
tightening torque.)
Liquid side
Gas side
Expand the liquid side on-site piping (ID ø9.52 mm [3/8 in]) and connect to the refrigerant service valve piping.
Use the included connecting pipe
4
to connect.
Use the included connecting pipe
3
to connect.
Expand the liquid side on-site piping (ID ø12.7 mm [1/2 in]) and connect to the refrigerant service valve piping.
Use the included connecting pipe
5
to connect.
Use the included connecting pipe
6
to connect.
Use the included connecting pipe
7
to connect.
Expand the gas side on-site piping (ID ø28.58 mm [1-1/8 in]) and connect to the refrigerant service valve piping.
•
Bottom pipe routing
P72,P96
P96
*1
P120
P120
*2
,P144
P72
P96
P120
P144
Liquid side
Gas side
Use the included connecting pipe
8
to connect.
Use the included connecting pipe
4
and
8
to connect.
Use the included connecting pipe
3
and
9
to connect.
Use the included connecting pipe
9
to connect.
Use the included elbow
1
and connecting pipe
5
to connect.
Use the included elbow
1
and connecting pipe
6
to connect.
Use the included elbow
2
and connecting pipe
7
to connect.
Use the included elbow
2
to connect.
•
Front pipe routing
P72,P96
P96
*1
P120
P120
*2
,P144
P72
P96
P120
P144
*1 Over 90m [295ft]
*2 Over 40m [131ft ] , In the case the unit is used in combination with other outdoor units.
Satisfy the minimum insertion depth in the table below when expanding on-site
piping
Pipe diameter
(mm [in])
5 [7/32] or more, less than 8 [11/32]
8 [11/32] or more, less than 12 [1/2]
12 [1/2] or more, less than 16 [21/32]
16 [21/32] or more, less than 25 [1]
25 [1] or more, less than 35 [1-13/32]
35 [1-13/32] or more, less than 45 [1-25/32]
Minimum insertion depth
(mm [in])
6 [1/4]
7 [9/32]
8 [11/32]
10 [13/32]
12 [1/2]
14 [9/16]
Caution:
•
Keep the valve closed until refrigerant charging to the pipes to be added
on site has been completed. Opening the valve before charging the re-
frigerant may cause damage to the unit.
•
Do not use a leak detection additive.
Appropriate tightening torque:
Outer diameter of
copper pipe (mm [in])
ø9.52 [3/8]
ø12.7 [1/2]
ø15.88 [5/8]
ø19.05 [3/4]
ø25.4 [1]
ø28.58 [1-1/8]
Shaft
(N·m/kg·cm)
6/60
9/90
15/150
30/300
30/300
-
Size of hexagonal
wrench (mm)
4
4
6
6
10
-
Cap
(N·m/kg·cm)
15/150
20/200
25/250
25/250
25/250
25/250
Service port
(N·m/kg·cm)
12/120
16/160
No.
Shape
No.
Shape