14
11
11.2
[Fig. 11.2.1]
C
L1 L2 L3
Terminal block for indoor –
outdoor transmission line
(TB3)
Terminal block for
centralized control
(TB7)
Power supply terminal block
(TB1)
Control box
A
B
[Fig. 11.2.2]
A
B
C
[Fig. 11.2.3]
A
B
C
E
D
[Fig. 11.2.4]
PQHY-P·T(S)LMU-A/Y(S)LMU-A, PQRY-P·T(S)LMU-A/Y(S)LMU-A
A
A
A
B
C
A
A
A
B
C
A
: Power source
B
: Transmission line
C
: Ground terminal
A
: Cable strap
B
: Power source cable
C
*URXQGWHUPLQDOIRU¿HOGZLULQJFRQQHFWLRQ
A
: Power wires, transmission lines
B
'DLV\FKDLQWUDQVPLVVLRQOLQHVRQO\
C
7HUPLQDOEORFNV7%7%7%
D
: Make an alignment mark.
E
: Install the ring terminals back to back.
A
: Terminal block with loose screws
B
: Properly installed terminal block
C
: Spring washers must be parallel to the terminal block.
Summary of Contents for CITY MULTI PQHY-P-TLMU-A
Page 55: ......