15
7-3. Setting of Dip-switch (at delivery)
7-4. Attention for test run
1 2 3
S W 4
5
1 2 3
S W 4
5
SWA
1
SWC
Standard
Indicate
Models
Dip-SW
ON
OFF
220V
240V
S W 5
PEFY-P54
NMHU-E-F
S W 1
ON
OFF
S W 2
ON
OFF
ON
OFF
S W 3
ON
OFF
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6
ON
OFF
220V
240V
S W 5
PEFY-P72
NMHU-E-F
S W 1
ON
OFF
S W 2
ON
OFF
ON
OFF
S W 3
ON
OFF
S W 4
5
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6 7 8 910
1 2 3
S W 4
5
4
4
4
4
1 2 3
1 2 3 4 5 6
ON
OFF
220V
240V
S W 5
PEFY-P96
NMHU-E-F
S W 1
ON
OFF
S W 2
ON
OFF
ON
OFF
S W 3
ON
OFF
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6 7 8 910
1 2 3 4 5 6
ON
OFF
220V
240V
S W 5
PEFY-P30
NMHU-E-F
S W 1
S W 2
ON
OFF
ON
OFF
ON
OFF
ON
OFF
1 2 3
S W 7
ON
OFF
1 2 3
S W 7
ON
OFF
1 2 3
S W 7
ON
OFF
1 2 3
S W 7
ON
OFF
S W 3
Equipment which is attached drain water lift up kit can be tested
pump out test when power supplied.(connect the connector(A))
< Drain-up machine >
Test run Connector (red)(A)
After pump out test, remove the connector
and put in the dummy connector.
After test run,remove the connector (A)(Fig .1)
Symbol
LED operation under normal state
Lighting
LED1
At applying main power source
At receiving MA transmission power source
LED2
Lighting
7-5. Function the
unit
of the indoor
LED
service board