2. EXTERNAL DIMENSIONS
Hydro unit
CMH-WM250, 350, 500V-A
Unit: mm
30mm max
M10 anchor bolt <field supply required>
Fig.A
Fixing plate <field supply required>
Fig.B
1. Foundation work
1
T
a
ke into consideration the surface strength, water drainage route,
piping route, and wiring route when preparing the installation site.
<Note that the drain water comes out of the unit during operation.>
2 Build the foundation in such way that the corner of the installation leg is
securely supported as shown in the right figure.(Fig.A)
When using a rubber isolating cushion, please ensure it is large enough
to cover the entire width of each of the unit's legs.
3
The protrusion length of the anchor bolt must not exceed 30mm.(Fig.A)
4 Use four fixing plates as shown in the right figure <field supply required>
when using post-installed anchor bolts.(Fig.B)
5
T
o
prevent small animals and water and snow from entering the unit and damaging its parts,
close the gap around the edges of through holes for pipes and wires with
filler plates <field supply required>.
6 When the pipes or cables are routed at the bottom of the unit,
make sure that the through hole at the base of the unit does not get blocked
with the installation base.
7 Refer to the Installation Manual when installing units on an installation base.