MEES18K070
H
ydr
o u
n
it
2
1. SPECIFICATIONS
Hydro unit
I.Hydro unit
1. SPECIFICATIONS
Model name
CMH-WM250V-A
Power source
1-phase 220-230-240 V
50 Hz
60 Hz
Power input
Cooling
kW
0.74/0.74/0.74
0.74/0.74/0.74
(220/230/240) Heating
kW
0.74/0.74/0.74
0.74/0.74/0.74
Current input
Cooling
A
3.84/3.67/3.52
3.84/3.67/3.52
(220/230/240) Heating
A
3.84/3.67/3.52
3.84/3.67/3.52
Sound pressure level (measured in anechoice room)
dB <A>
60
Applicable temperature range of installation site
°C (D.B.)
-5~52
External finish
Pre-coated galvanized steel sheets
(Lower part drain pan: Pre-coated galvanized powder coating)
Connectable outdoor/heat source unit capacity
(E)M200~250
External dimension H x W x D
mm
660 x 920 x 740
in.
25-63/64 x 36-7/32 x 29-9/64
Refrigerant piping
diameter
To outdoor/heat source unit
Connectable outdoor/heat source unit capacity
M200
M250
EM200
EM250
Liquid pipe
mm (in.)
9.52 (3/8)
9.52 (3/8)
9.52 (3/8)
9.52 (3/8)
O.D.
Brazed
Brazed
Brazed
Brazed
Gas pipe
mm (in.)
22.2 (7/8)
22.2 (7/8)
22.2 (7/8)
22.2 (7/8)
O.D.
Brazed
Brazed
Brazed
Brazed
Water piping
diameter
To Indoor unit
Inlet Pipe
mm (in.)
I.D.
40 (1-1/2) housing joint
Outlet Pipe
mm (in.)
I.D.
40 (1-1/2) housing joint
Net weight
kg (lbs)
112 (247) [119 (263) with water]
Standard
attachment
Document
–
Accessories
Y-type strainer, Auto air vent valve, Joint, Elbow, Pipe
Optional parts
Drain pan (PAC-SH01DP-E)
Note
1.Works not included:
Installation/foundation work, electrical connection work, duct work, insulation work, power source switch, and other items are not specified in this specifications.
2.The equipment is for R32 refrigerant.
3.Install this product in a location where noise (refrigerant noise) emitted by the unit will not disturb the neighbors.
(For use in quiet environments with low background noise, position the Hydro unit at least 5 m away from any indoor units.)
4.Please install the Hydro unit in a place where noise will not be an issue.
5.Please attach an expansion vessel (field supply).
6.Use copper, plastic, steel, or stainless steel pipes for the water circuit. Furthermore, when using copper pipe-work use a non-oxidative brazing method.
Oxidation of the pipe-work will reduce the pump life.
7.When brazing the pipes, be sure to braze, after covering a wet cloth to the insulation pipes of the units in order to prevent it from burning and shrinking by heat.
8.Please install an air purge valve where air will gather in the water circuit.
9.Please install a pressure reducing valve and a strainer on the water supply to the Hydro unit.
10.Please refer to the databook or the installation manual for the specified water quality.
11.Please always make water circulate or pull out the circulation water completely when not using it. *Please do not use it as a drinking water.
12.Please do not use ground water and well water.
13.When installing the Hydro unit in an environment which may drop below 0 °C, please add antifreeze to the circulating water.
(Refer to the data-book and the installation manual).
14.R32 is flammable, and certain restrictions apply to the installation of units.
When installing new units, moving the existing units, or changing the layout of the room,
ensure that installation restrictions are observed.
For detail, refer to the section in the Databook on installation restrictions.
15.Drain or condensation water will be discharged from hydro units during test run. If this will be a problem, install a separately sold drain pan.
16.Do not install the unit where it could be salt-damaged.
0000005070.BOOK 2 ページ 2018年11月15日 木曜日 午後6時41分