Installation Checklist
Package Checklist
Task
Verified by
Date
Network information available
and recorded in site log.
Location requirements verified.
Site power Voltage
Installation site pre-power
check completed.
Mounting tools and equipment
available.
Additional equipment available.
EX Controller received.
Quick start guide received.
Regulatory compliance and
safety information received.
Warranty card received.
Software version verified.
Rack, desktop mounting of
chassis completed.
Initial electrical connections
established.
Cable length limits verified.
Initial configuration performed.
Initial operation verified.
Task
Verified by
Date
1 EX Controller.