![background image](http://html1.mh-extra.com/html/mircom/fa-262/fa-262_installation-and-operators-manual_1805750005.webp)
FA-262 Installation & Operator’s Manual
iii
List of Figures
Figure 1: FA-262 cabinet with door closed .......................................................................... 4
Figure 2: FA-262 display and controls ................................................................................ 4
Figure 3: FA-262 Cabinet Overview .................................................................................... 4
Figure 4: Zone Label Insert ................................................................................................. 4
Figure 5: Panel Assembly and Modules Locations ............................................................. 8
Figure 6: Mounting Dimensions .......................................................................................... 9
Figure 7: Knockout Locations .............................................................................................. 9
Figure 8: FA-262 Terminal Descriptions ............................................................................. 10
Figure 9: Connecting 2-Wire Alarm Initiating Devices ......................................................... 11
Figure 10: Connecting 4-Wire Smoke Detectors ................................................................. 12
Figure 11: Connecting NAC Devices (Class ‘B’) ................................................................. 12
Figure 12: Connecting NAC Devices (Class ‘A’) ................................................................. 12
Figure 13: Connecting Batteries .......................................................................................... 13
Figure 14: Connecting AC Power ........................................................................................ 13
Figure 15: Connecting the Alarm and Trouble Relays ........................................................ 14
Figure 16: Connecting Optional Devices ............................................................................. 14
Figure 17: Locating the Walk Test Switch ........................................................................... 22