![background image](http://html1.mh-extra.com/html/mircom/fa-262/fa-262_installation-and-operators-manual_1805750003.webp)
FA-262 Installation & Operator’s Manual
i
Table of Contents
1.0 Introduction ...................................................................................................................... 1
1.1 The FA-262 Fire Alarm Control Unit .............................................................................. 1
1.2 Codes, Standards and Installation Requirements ......................................................... 1
1.3 Technical Support and General Information ................................................................. 2
1.4 System Verification ....................................................................................................... 2
1.5 Standby Power .............................................................................................................. 2
1.6 Battery Maintenance ..................................................................................................... 2
2.0 Preparing to Install the FA-262 Fire Panel ..................................................................... 3
2.1 Unpacking the FA-262 .................................................................................................. 3
2.2 Optional Accessories .................................................................................................... 3
2.3 FA-262 Overview .......................................................................................................... 4
2.4 Planning Your Installation ............................................................................................. 5
2.5 Electrical Specifications ................................................................................................ 5
2.6 Module Current Ratings ................................................................................................ 6
2.7 Standby Battery calculation chart .................................................................................. 6
2.8 Calculation for Standby Battery Requirement ............................................................... 7
3.0 Installing the FA-262 Fire Panel ...................................................................................... 8
3.1 Environmental Specifications ........................................................................................ 8
3.2 Panel Assembly and Modules Locations ...................................................................... 8
3.3 Mounting the FA-262 ..................................................................................................... 9
4.0 Wiring the FA-262 ............................................................................................................. 10
4.1 Wiring Specifications ..................................................................................................... 10
4.2 Connecting NAC Devices (Class ‘A’ and Class ‘B’) ...................................................... 12
5.0 Panel Operation ................................................................................................................ 16
5.1 Operating Sequences ................................................................................................... 16
5.2 General Zone Fire Alarms ............................................................................................. 16
5.3 Waterflow Alarms .......................................................................................................... 16
5.4 Supervisory Zone Alarms .............................................................................................. 17
5.5 Trouble Operation ......................................................................................................... 17
5.6 System Reset Operation ............................................................................................... 19
5.7 Lamp Test ..................................................................................................................... 19
5.8 Walk Test (Installer function only) ................................................................................. 20
5.9 NAC operation ............................................................................................................... 21
5.10 Relay Function ............................................................................................................ 21
6.0 Programming the FA-265 System ................................................................................... 22
6.1 How to Program the FA-265 ......................................................................................... 22
6.2 Programming Section Descriptions ............................................................................... 24
6.3 Viewing the Event Buffer ............................................................................................... 27
7.0 Startup of the FA-265 ....................................................................................................... 29
7.1 Prior to power up ........................................................................................................... 29
7.2 Power up sequence ...................................................................................................... 29
7.3 Default Operation .......................................................................................................... 29
7.4 Programming the Panel ................................................................................................ 29
7.5 Final Verification ............................................................................................................ 29
8.0 Programming Worksheets ............................................................................................... 30
8.1 Entering Programming Mode ........................................................................................ 30
8.2 Zone Programming (Section 0) ..................................................................................... 31
8.3 NAC Temporal/Steady Programming (Section 1) ......................................................... 31
8.4 NAC Auto-silence, Strobe Programming (Section 2) .................................................... 31
8.5 Silence Inhibit and Walk Test Programming (Section 3) ............................................... 32
8.6 Waterflow Programming (Section 4) ............................................................................. 32
8.7 50/60 Hz Option (Section 5) .......................................................................................... 32