Step 9
AFTER applying pipe sealer to all the male fittings and plug in
the
3
/
4
” “T,” glue the “T” assembly to the fill line with the
threaded fitting pointed at 90˚pointing to the short end of the
tank. Point the fitting toward the wall that’s closest.
Step 10
Make any adjustments before the cement sets up.
Step 11
Using the same PVC cement, apply it to the bottom of your 4”
riser pipe. Make sure all connections are clean before
applying glue.
523548_Miraco_3410-4:Layout 1 3/19/14 11:47 PM Page 5