3. After suitable support is installed and 
the supply and drain work is complete, 
temporarily place the lavatory level on the 
pedestal and in the final location. (A) Mark 
the locations of the Lavatory Wall Anchor 
Points. (B) Mark the location of the Pedes-
tal Floor Anchor Point. (C) Slide the Wall 
Hanger Bracket into location at the back of 
the lavatory and mark the pilot holes. 

INSTALLATION

 (FIG.3)

3. Lorsqu’un renforcement adéquat est installé 

et que la mise en place de la canalisation 

de l’alimentation en eau et de drainage est 

complétée, placez temporairement le lavabo 

à niveau sur son pied et à l’emplacement final. 

(A)Marquez les emplacements des points 

d’ancrage mural du lavabo. (B) Marquez 

l’emplacement du point d’ancrage du pied au 

plancher. (C) Glissez le support de suspension 

mural en place à l’arrière du lavabo et mar-

quez les trous pilotes.

INSTALACIÓN

 (GRÁF.3)

3. Luego de instalarse el soporte adecua-
do y completarse el trabajo de suminis-
tro y drenaje, colocar temporalmente el 
nivelador del lavabo en el pedestal y en la 
ubicación final. (A) Marcar las ubicaciones 
de los puntos de anclaje en la pared del 
lavabo. (B) Marcar la ubicación del punto 
de anclaje del pedestal. (C) Deslizar el 
soporte del colgante de pared detrás del 
lavabo y marcar los orificios piloto.

(FIG.3)

(GRÁF.3)

A

B

C

D

F

I

Recommended Tools & Materials

(A) Regular Screwdriver/Phillips Screwdriver (B) Adjustable Wrench  (C) Marker  (D) Tape Measure
(E) Pipe Wrench  (F) Plumbers Putty  (G) Hacksaw (H) Channel Lock Pliers (I) Level
(J) Silicone Sealant (K) Drill (L) Jig Saw (M) Putty Knife (N) Basin Wrench (O) Tube Cutter

CAUTION: PRODUCT IS FRAGILE
Handle with care to avoid breakage and
possible injury!

Note: Views in this illustrations are for general representation
and may not necessarily define the exact contours of the product.

-1-

L

Find the

and general location of

Lavatory Wall Anchor Points

the

that is included with lavatory. Provide

Wall Hanger Bracket

suitable reinforcement behind the finished wall for the lavatory to
be anchored during installation with these locations.

1

2

E

G

H

M

J

K

If replacing an existing sink be certain to shut off
water supply before removing old sink.

SINK INSTALLATION:

3

4

Pedestal Lavatory and Pedestal Installation

N

Pedestal Floor
Anchor Point

Finished

Floor

X

Y

Determine the horizontal position of the

Lavatory Wall Anchor

Points

by setting the lavatory level on the pedestal and

measuring the height,

from the finished floor.  Now measure

“X”

the distance between the

,

.

Lavatory Wall Anchor Points

“Y”

O

Lavatory Wall
Anchor Points

A

B

After suitable support is installed and the supply and drain
work is complete, temporarily place the lavatory level on the
pedestal and in the final location.  (A) Mark the locations of the

Lavatory Wall Anchor Points

.  (B)  Mark the location of the

Pedestal Floor Anchor Point

. (C) Slide the Wall Hanger Bracket

into location at the back of the lavatory and mark the pilot holes.

Finished W

all

Finished Floor

Lavatory Wall
Anchor Points

Hot & Cold

Supply

Drain

X

Y

Wall Hanger Bracket

Remove the wall hanger bracket, lavatory and pedestal.
Drill appropriate size pilot holes, (7/32” for hard wood) in the
seven marked locations for using 1/4” lag screws (not supplied)
The lag screws are for securing the hanger and lavatory to the
wall and the pedestal to the floor.

C

Finished Floor

Plancher fini / Suelo terminado

Finished W

all

Mur fini / 

 Par
ed terminada

Par

ed 

INSTALLATION

 (FIG.2)

2. Find the Lavatory Wall Anchor Points 
and general location of the Wall Hanger 
Bracket that is included with lavatory. 
Provide suitable reinforcement behind fin-
ished wall for the lavatory to be anchored 
during installation with these locations.

INSTALLATION

 (FIG.2)

2. Localisez les points d’ancrage au mur 
du lavabo et l’emplacement général du 
support de suspension mural inclus avec 
le lavabo. Assurez un renforcement adapté 
derrière le mur fini pour ancrer le lavabo au 
cours de l’installation à ces emplacements.

INSTALACIÓN

 (GRÁF.2)

2. Encontrar los puntos de anclaje de la 
pared del lavabo y la ubicación general 
del soporte del colgador de pared que 
se incluye con el lavabo. Proporcionar un 
refuerzo detrás de la pared terminada 
para que el lavabo se coloque durante la 

(FIG.2)

A

B

C

D

F

I

Recommended Tools & Materials

(A) Regular Screwdriver/Phillips Screwdriver (B) Adjustable Wrench  (C) Marker  (D) Tape Measure
(E) Pipe Wrench  (F) Plumbers Putty  (G) Hacksaw (H) Channel Lock Pliers (I) Level
(J) Silicone Sealant (K) Drill (L) Jig Saw (M) Putty Knife (N) Basin Wrench (O) Tube Cutter

CAUTION: PRODUCT IS FRAGILE
Handle with care to avoid breakage and
possible injury!

Note: Views in this illustrations are for general representation
and may not necessarily define the exact contours of the product.

-1-

L

Find the

and general location of

Lavatory Wall Anchor Points

the

that is included with lavatory. Provide

Wall Hanger Bracket

suitable reinforcement behind the finished wall for the lavatory to
be anchored during installation with these locations.

1

2

E

G

H

M

J

K

If replacing an existing sink be certain to shut off
water supply before removing old sink.

SINK INSTALLATION:

3

4

Pedestal Lavatory and Pedestal Installation

N

Pedestal Floor
Anchor Point

Finished

Floor

X

Y

Determine the horizontal position of the

Lavatory Wall Anchor

Points

by setting the lavatory level on the pedestal and

measuring the height,

from the finished floor.  Now measure

“X”

the distance between the

,

.

Lavatory Wall Anchor Points

“Y”

O

Lavatory Wall
Anchor Points

A

B

After suitable support is installed and the supply and drain
work is complete, temporarily place the lavatory level on the
pedestal and in the final location.  (A) Mark the locations of the

Lavatory Wall Anchor Points

.  (B)  Mark the location of the

Pedestal Floor Anchor Point

. (C) Slide the Wall Hanger Bracket

into location at the back of the lavatory and mark the pilot holes.

Finished W

all

Finished Floor

Lavatory Wall
Anchor Points

Hot & Cold

Supply

Drain

X

Y

Wall Hanger Bracket

Remove the wall hanger bracket, lavatory and pedestal.
Drill appropriate size pilot holes, (7/32” for hard wood) in the
seven marked locations for using 1/4” lag screws (not supplied)
The lag screws are for securing the hanger and lavatory to the
wall and the pedestal to the floor.

C

Wall Hanger Bracket

Lavatory Wall 

Anchor Points

Hot & Cold 

Supply

(FIG.2)

A

B

C

D

F

I

Recommended Tools & Materials

(A) Regular Screwdriver/Phillips Screwdriver (B) Adjustable Wrench  (C) Marker  (D) Tape Measure
(E) Pipe Wrench  (F) Plumbers Putty  (G) Hacksaw (H) Channel Lock Pliers (I) Level
(J) Silicone Sealant (K) Drill (L) Jig Saw (M) Putty Knife (N) Basin Wrench (O) Tube Cutter

CAUTION: PRODUCT IS FRAGILE
Handle with care to avoid breakage and
possible injury!

Note: Views in this illustrations are for general representation
and may not necessarily define the exact contours of the product.

-1-

L

Find the

and general location of

Lavatory Wall Anchor Points

the

that is included with lavatory. Provide

Wall Hanger Bracket

suitable reinforcement behind the finished wall for the lavatory to
be anchored during installation with these locations.

1

2

E

G

H

M

J

K

If replacing an existing sink be certain to shut off
water supply before removing old sink.

SINK INSTALLATION:

3

4

Pedestal Lavatory and Pedestal Installation

N

Pedestal Floor
Anchor Point

Finished

Floor

X

Y

Determine the horizontal position of the

Lavatory Wall Anchor

Points

by setting the lavatory level on the pedestal and

measuring the height,

from the finished floor.  Now measure

“X”

the distance between the

,

.

Lavatory Wall Anchor Points

“Y”

O

Lavatory Wall
Anchor Points

A

B

After suitable support is installed and the supply and drain
work is complete, temporarily place the lavatory level on the
pedestal and in the final location.  (A) Mark the locations of the

Lavatory Wall Anchor Points

.  (B)  Mark the location of the

Pedestal Floor Anchor Point

. (C) Slide the Wall Hanger Bracket

into location at the back of the lavatory and mark the pilot holes.

Finished W

all

Finished Floor

Lavatory Wall
Anchor Points

Hot & Cold

Supply

Drain

X

Y

Wall Hanger Bracket

Remove the wall hanger bracket, lavatory and pedestal.
Drill appropriate size pilot holes, (7/32” for hard wood) in the
seven marked locations for using 1/4” lag screws (not supplied)
The lag screws are for securing the hanger and lavatory to the
wall and the pedestal to the floor.

C

Support de  

suspension mural

Points d’ancrage 

au mur du lavabo 

Alimentation  

en eau chaude 

et froide 

(GRÁF.2)

A

B

C

D

F

I

Recommended Tools & Materials

(A) Regular Screwdriver/Phillips Screwdriver (B) Adjustable Wrench  (C) Marker  (D) Tape Measure
(E) Pipe Wrench  (F) Plumbers Putty  (G) Hacksaw (H) Channel Lock Pliers (I) Level
(J) Silicone Sealant (K) Drill (L) Jig Saw (M) Putty Knife (N) Basin Wrench (O) Tube Cutter

CAUTION: PRODUCT IS FRAGILE
Handle with care to avoid breakage and
possible injury!

Note: Views in this illustrations are for general representation
and may not necessarily define the exact contours of the product.

-1-

L

Find the

and general location of

Lavatory Wall Anchor Points

the

that is included with lavatory. Provide

Wall Hanger Bracket

suitable reinforcement behind the finished wall for the lavatory to
be anchored during installation with these locations.

1

2

E

G

H

M

J

K

If replacing an existing sink be certain to shut off
water supply before removing old sink.

SINK INSTALLATION:

3

4

Pedestal Lavatory and Pedestal Installation

N

Pedestal Floor
Anchor Point

Finished

Floor

X

Y

Determine the horizontal position of the

Lavatory Wall Anchor

Points

by setting the lavatory level on the pedestal and

measuring the height,

from the finished floor.  Now measure

“X”

the distance between the

,

.

Lavatory Wall Anchor Points

“Y”

O

Lavatory Wall
Anchor Points

A

B

After suitable support is installed and the supply and drain
work is complete, temporarily place the lavatory level on the
pedestal and in the final location.  (A) Mark the locations of the

Lavatory Wall Anchor Points

.  (B)  Mark the location of the

Pedestal Floor Anchor Point

. (C) Slide the Wall Hanger Bracket

into location at the back of the lavatory and mark the pilot holes.

Finished W

all

Finished Floor

Lavatory Wall
Anchor Points

Hot & Cold

Supply

Drain

X

Y

Wall Hanger Bracket

Remove the wall hanger bracket, lavatory and pedestal.
Drill appropriate size pilot holes, (7/32” for hard wood) in the
seven marked locations for using 1/4” lag screws (not supplied)
The lag screws are for securing the hanger and lavatory to the
wall and the pedestal to the floor.

C

Soporte del  

colgador de pared

Pared del 

lavabo

Suministro de 

agua fría y 

caliente

Reviews: