Load cells to be used
Load cells not to be used
PR 6251/..L, /..LE
PR 6251/..LA, /..LAC
Novego®/..D1, /..D1E, /..C3, /..C3E
MP 55/..C3MR+, /..C3MR+E
MP 58(T)/..C3MR, /..C3MRE
MP 70/..C3MR
MP 71/..C3MR
MP 72/..C3MR, /..C3MRE
MP 76/..N, /..C3
MP 77/..C3MR, /..C3MRE
MP 79(T)/..C3MR, /..C3MRE
2.3
Incoming goods inspection
The shipment must be checked for completeness. A visual inspection must be performed
to determine if the shipment has been damaged. If there are grounds for a complaint, this
must be brought to the attention of the delivery company immediately. A Minebea Intec
sales or service point must be informed.
2.4
Before operational startup
NOTICE
Perform visual inspection.
Before operational startup as well as after storage or transport, inspect the device
visually for signs of mechanical damage.
2.5
Repairs and maintenance
2.5.1
General information
Repairs are subject to inspection and must be carried out at Minebea Intec.
In case of defect or malfunction, please contact your local Minebea Intec dealer or service
center for repair.
When returning the device for repair, please include a precise and complete description of
the problem.
Maintenance work may only be carried out by a trained technician with expert knowledge
of the hazards involved and the required precautions.
Cable Junction Box PR 6130/68S
2 Safety instructions
Minebea Intec
EN-6