• If the grout (after mixing) is too thin (causing it to flow from under the base
pads), install temporary cardboard framing around the pads to retain the grout
until it cures.
2. After the grout has completely cured, raise the machine sufficiently to remove all
temporary blocking and shims.
Be careful to avoid disturbing or damaging grout.
3. Lower machine onto grout and tighten all foundation fasteners until they contact the
top of the base plate.
2. Tighten all fasteners evenly, using only one-quarter turn on each fastener before moving to
the next one. While tightening, frequently skip from front to back and right to left to insure
uniform tension. After tightening all fasteners, check each fastener at least twice.
— End of BIRUUI01 —
Summary of Contents for MCR12E5
Page 29: ...Section 1 Service and Maintenance ...
Page 46: ......
Page 47: ...Section 2 Drive Assemblies ...
Page 51: ...Section 3 Bearing Assemblies ...
Page 56: ......
Page 57: ...Section 4 Shell and Door Assemblies ...
Page 70: ......
Page 71: ...Section 5 Control and Sensing ...
Page 79: ...Section 6 Chemical Supply ...
Page 89: ...Section 7 Water and Drain ...
Page 97: ...Section 8 Dimensional Drawings ...
Page 98: ......
Page 99: ......
Page 100: ......
Page 101: ......
Page 102: ......
Page 103: ......
Page 104: ......
Page 105: ......
Page 106: ......
Page 107: ......
Page 108: ......
Page 109: ......
Page 110: ......
Page 111: ......