OM-463 Page 15
SECTION 4 − INSTALLATION
4-1.
Installing Welding Generator
install1 3/96 − Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
1
2
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
GND/PE
3
4
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding
Terminal
4
Grounding Cable
Use #10 AWG or larger insulated
copper wire.
If unit does not have GFCI re-
ceptacles, use GFCI-
protected extension cord.
2
OR
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
Grounding
OR
Do Not Lift Unit From End
4-2.
Connecting The Battery
−
+
Connect (−) Cable Last.
Summary of Contents for Big Blue 400D
Page 4: ......
Page 42: ...OM 463 Page 38 Figure 8 2 Circuit Diagram For Welding Generator Models With CV Option ...
Page 43: ...OM 463 Page 39 ST 184 954 B ...
Page 66: ...Notes ...