OM-481 Page 13
SECTION 4 – INSTALLATION
4-1.
Installing Welding Generator
install1 7/02 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
GND/PE
1
2
Always securely fasten
welding generator onto
transport vehicle or trailer
and comply with all DOT and
other applicable codes.
Always ground generator
frame to vehicle frame to pre-
vent electric shock and static
electricity hazards.
If unit does not have GFCI re-
ceptacles, use GFCI-
protected extension cord.
1
Equipment Grounding
Terminal (On Front Panel)
2
Grounding Cable (Not
Supplied)
3
Metal Vehicle Frame
Connect cable from equipment
ground terminal to metal vehicle
frame. Use #10 AWG or larger
insulated copper wire.
3
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
Grounding
OR
Do Not Lift Unit From End
4-2.
Connecting The Battery
1/2 in
–
+
Connect Negative (–)
Cable Last.
Tools Needed:
ST-153 654-B / Ref. SD-131 784-A / Ref. S-0756-B
OFF
START
RUN
Summary of Contents for Big Blue 600D
Page 4: ......
Page 26: ...OM 481 Page 22 7 2 Maintenance Label...
Page 34: ...OM 481 Page 30 SECTION 8 ELECTRICAL DIAGRAM Figure 8 1 Circuit Diagram For Welding Generator...
Page 35: ...OM 481 Page 31 194 139 B...
Page 56: ...OM 481 Page 52 Notes...
Page 57: ......
Page 58: ......