OM-477 Page 43
9-10. Typical Connections To Supply Standby Power
S-0405-A
1
Power Company Service
Meter
2
Main and Branch Overcurrent
Protection
3
Double-Pole, Double-Throw
Transfer Switch
Obtain and install correct switch.
Switch rating must be same as or
greater than the branch overcurrent
protection.
4
Circuit Breakers or Fused
Disconnect Switch
Obtain and install correct circuit
breakers or switch.
5
Extension Cord
Select as shown in Section 9-11.
6
Generator Connections
Connect terminals or plug of ade-
quate amperage capacity to cord.
Follow all applicable codes and
safety practices.
Turn off or unplug all equipment
connected to generator before
starting or stopping engine. When
starting or stopping, the engine has
low speed which causes low volt-
age and frequency.
7
Load Connections
Customer-supplied equipment is required if
generator is to supply standby power during
emergencies or power outages.
120/240 Volt
60 Hz
Three-Wire
Service
240 V
120 V
120 V
Neutral
240 V
120 V
120 V
120/240 Volt
Single-Phase
Three-Wire
Generator Output
Connection
Ground
F1
or
CB
240 V
120 V
120 V
Load
1
2
3
6
7
4
5
Item 4 is not necessary if circuit
protection is already present in
welding generator auxiliary
power output circuit.
Summary of Contents for Big 40G
Page 4: ......
Page 29: ...OM 477 Page 25 7 2 Maintenance Label...
Page 38: ...OM 477 Page 34 Notes...
Page 41: ...OM 477 Page 37 193 967 A...
Page 49: ...OM 477 Page 45 Notes...