OM-477 Page 14
SECTION 4 – INSTALLATION
4-1.
Installing Welding Generator
install1 12/99 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
1
2
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
GND/PE
3
4
Always ground generator frame to ve-
hicle frame to prevent electric shock
and static electricity hazards.
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding Terminal
4
Grounding Cable
Use #10 AWG or larger insulated copper wire.
If unit does not have GFCI receptacles,
use GFCI-protected extension cord.
2
OR
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
Grounding
OR
Do Not Lift Unit From End
4-2.
Connecting The Battery
Ref. ST-138 751-B / Ref. ST-191 898 / Ref. S-0756-C
Tools Needed:
1/2 in
–
+
Connect
Negative (–)
Cable Last
4-3.
Installing Muffler
Tools Needed:
muff1 4/96 – ST-154 088-B / Ref. ST-191 898
1/2 in
Stop engine and let cool.
Do not blow exhaust toward
air cleaner or air intake.
Summary of Contents for Big 40G
Page 4: ......
Page 29: ...OM 477 Page 25 7 2 Maintenance Label...
Page 38: ...OM 477 Page 34 Notes...
Page 41: ...OM 477 Page 37 193 967 A...
Page 49: ...OM 477 Page 45 Notes...