9
3. Hardware Installation
Environmental Requirements
- Power Input: 9-48 VDC (48 VDC is needed for PoE output)
- Power Consumption: Typical 1.9W (Max 2.4 W)
- Operating Temperature: -40°C to 70°C (-40°F -158°F)
- Relative Humidity: 0% to 95% (non-condensing) at 25°C/77°F
3.1 SIM Card/Micro SD Card Installation
A. Unscrew the cover of the SIM card then
B. Put SIM card/Micro SD into the slot and
take it off.
screw it up.
3.2 Antenna Installation
Rotate the antenna into the antenna connector accordingly.
The external antenna should be installed vertically always on a site with a good signal.
3.3 Router Installation
The router can be placed on a desktop or mounted to a wall or a DIN rail.
3.3.1 Wall Mounting (Measured in mm)
Use 4 pcs of M3 × 6 flat head Phillips screws to fix the router on the wall.
Recommended torque for mounting is 1.0 N·m, and the maximum allowed is 1.2 N·m.