background image

 

Installationsplan PW 6201 EL 
Stand: 11.08.2004 

 Seite 

 

 

 
 

Technical datasheet 

 
 

 

 

 

 

Washer-extractor: 

 

Heating: 
 

PW 6201 

Electric (EL) 

 

 Legend: 

 

Circled, bold-type abbreviations: 
Connection required 

 

 

 

Abbreviations surrounded by broken circle: 
Connection optional or required, depending on model 

G

 

 

Optional extras: 

Miele plinth  

UG/UO 6020 

 

 

 

(UG = Box plinth/UO = Open plinth) 

 

 

UM 

 Height 

Model 

mm 

237 

 

 

Width UG (UO) 

mm 

920      (900) 

 

 

Depth UG (UO) 

mm 

1049   (1009) 

Concrete platform  Concrete platform optional (Min. quality B15) 

 

 

 Recommended 

height 

mm 

237 

BS 

 Minimum 

height 

mm 

100 

  

Recommended 

width 

mm 

920 

  

Recommended 

depth 

mm 

1020 

 

 

Ensure good anchorage! 

 

 

 
 

Machine connections: 

1. Standard voltage (as supplied) 

 

3N AC 380-415  

Electrical 

connection 

    Frequency 

 

Hz 

50 - 60 

  

 

Rated 

load 

 

kW 

21 

 

 

    Fuse rating 

 

3 × 35 

 

 

    Supply lead, min. cross section (M 32) 

 

mm² 

5 × 6.0 

 

2. Standard voltage (as supplied) 

 

3 AC 220-240 

 

    Frequency 

 

Hz 

50 - 60 

  

 

Rated 

load 

 

kW 

21 

 

 

    Fuse rating 

 

3 × 63 

 

 

    Supply lead, min. cross section (M 40) 

 

mm² 

4 × 16 

 

3. Standard voltage (as supplied) 

 

3 AC 440 

  

 

Frequency 

 

Hz 

60 

  

 

Rated 

load 

 

kW 

21 

 

 

    Fuse rating 

 

3 × 35 

 

 

    Supply lead, min. cross section (M 32) 

 

mm² 

4 × 6.0 

 

 

Plug and socket connection recommended to facilitate 
electrical safety tests. Socket must be accessible after 
installation.  
In the case of hard-wired connections, an all-pole mains 
switch with a minimum contact gap of 3 mm must be 
provided. 
The use of an earth leakage circuit breaker (ELCB) is strongly 
recommended. 
If necessary, equipotential bonding with good galvanic contact 
must be provided in accordance with all appropriate national 
and local regulations.

 

 

 

Connection cable, min. cross-section 

mm² 

4 × 1.5 

 

Peak load  

management 

Input leads should not be in direct contact with any source of 
heat. 

 

 

 

 

Input signal via potential-free (galvanically separated) contact.  

 

 

Summary of Contents for PW 6201 EL

Page 1: ...anta di installazione Plano de instalación Plano de instalação Σχέδιο εγκατάστασης Asennusohje Installasjonsplan Installationsplan G PW 6201 EL Materialnummer Mat no 06 478 890 Änderungsstand Version 00 Datum Zeichnung Drawing date 01 07 2004 Datum Legende Legend date 11 08 2004 ...

Page 2: ......

Page 3: ......

Page 4: ......

Page 5: ......

Page 6: ......

Page 7: ...cross section M 32 mm 5 6 0 2 Standard voltage as supplied V 3 AC 220 240 Frequency Hz 50 60 Rated load kW 21 Fuse rating A 3 63 Supply lead min cross section M 40 mm 4 16 3 Standard voltage as supplied V 3 AC 440 Frequency Hz 60 Rated load kW 21 Fuse rating A 3 35 Supply lead min cross section M 32 mm 4 6 0 Plug and socket connection recommended to facilitate electrical safety tests Socket must b...

Page 8: ...ater requirements average for 60 C programme Standard connection with hot water connection l h not yet available If connected to raw water supply subtract cold water soft volume If no raw water supply connect hose to cold water Max temperature C 95 Machine drain connection da s l DN 70 mm 75 1 9 115 On site drain connection di s l DN 70 sleeve mm 75 1 9 50 Drainage via dump valve Max transient thr...

Page 9: ...ked down dimensions W H mm 1100 x 1500 Recommended gap to opposite wall mm 1450 Net weight kg 499 Dynamic floor load max N 6076 Static floor load max N 5543 Drum frequency max Hz 18 3 Average heat dissipation dependent on ambient room temperature and programme selected W not yet available Installation should only be carried out by authorised fitters in accordance with valid regulations Observe ins...

Reviews: