All work on the electrical
connection must be carried out by
Miele Service.
– The electrical installation must be in
compliance with current local and
national safety regulations.
– The plug connection must comply
with national regulations. (The
electrical outlet must be accessible
after the appliance has been
installed.) This facilitates access for
electrical safety checks, for example
when the appliance is being repaired
or serviced.
– If the appliance is hard wired, a
multiple-pole circuit breaker must be
installed. The contact opening at the
main breaker must be at least 3 mm
wide and lockable in the open
position.
– If necessary, an equalization of the
potentials must be carried out.
– If replacing the power cord, use only
original Miele replacement parts or a
suitable cord
with core cable ends
.
– For technical data, see the data plate
or the attached wiring diagram!
The appliance must only be operated
with the voltage, frequency and fuse
rating shown on the
data plate
.
A
conversion
may only be performed
according to the attached conversion
diagram
and
wiring diagram
.
The
data plates
are at the back of the
appliance and along the right edge of
the open door.
The
wiring diagram
comes with the
appliance.
The
conversion diagram
is attached to
the base panel behind the plastic base
cover.
Electrical connection
65