Integrated installations
Custom made front panels can be installed with models
ESW 4702 FB and ESW 4802 FB.
The custom panel must be at least
3
/
4
" (19 mm) thick and
made of heat resistant material 140 °F (60 °C). The front
panel, including handle, must not exceed 11 lb (5 kg) in
weight.
^
Install a handle to the custom front panel using
countersunk screws.
^
Remove the screws from the left and right sides of the
drawer front and carefully lift the control panel out of the
drawer (see chapter "Aligning the appliance front")> Be
careful not to pull or damage the power cord.
^
Remove the two screws on the inner side of the drawer and
remove the panel from the appliance front.
^
Pre-drill the custom front panel (see illustration).
C
3/8" (10 mm), t = 3/8" (10 mm)
Installation
34
Summary of Contents for ESW4082-14
Page 7: ...ESW 4082 14 ESW 4088 14 aControl panel bNon slip mat Guide to the warming drawer 7 ...
Page 8: ...ESW 47x2 ESW 48x2 aControl panel bNon slip mat cVent dRack Guide to the warming drawer 8 ...
Page 27: ...Solo installation Side view aA base is required for solo installations ESW 47x2 27 ...
Page 28: ...Installation with an oven Side view with oven ESW 47x2 28 ...
Page 29: ...Solo installation Side view aA base is required for solo installations ESW 48x2 29 ...
Page 30: ...Installation with an oven Side view with oven ESW 48x2 30 ...
Page 38: ...38 ...
Page 39: ...39 ...