Supervisor level
81
Peak load prevention
The peak-load negotiation function
can be deactivated with disinfection
programmes. When a signal is re-
gistered, the washing machine's
heater is not switched off.
Factory default: Off
Alternating current
The time left display depends on the
electrical connection. If a single-phase
connection is used, the setting must
be switched to
No
.
Factory default: Yes
Heating
The heating can be switched off and
the Thermostop step is skipped. In ad-
dition, heater fault monitoring is deac-
tivated.
Factory default: On
Payment system
External hardware is connected via the
Miele XCI box.
If you wish to change the settings after
the commissioning process, please
contact Miele Service.
Settings for payment systems
You would like to connect a payment
system.
- No payment system
The next settings are skipped and ini-
tial commissioning can be com-
pleted.
- Programme operation
The machine is operated using a coin
box. The user purchases a wash pro-
gramme.
- Timed operation
The machine is operated using a coin
box. The user purchases a time-man-
aged programme.
- Timed operation with pulse counter
For payment systems where the us-
age time is increased each time a
coin is inserted.