Miele professional PWT 6089 EL Installations Plan Download Page 9

Technical datasheet 

Washer/Dryer stack: 
Heating: 

  PWT 6089 LP (Drain pump)

 

  Electric (EL)

 

Legend: 

Abbreviations in bold type:

 

Connection required 

en - US 

Abbreviations in circle with dashes:

 

Connection optional or required depending on model version 

Options/accessoires: 

Dispensing 

pump 

External dispensing pumps (2 or 4 head pump): 
Voltage (external power supply required) 

120V 

Fusing 

15A

 

Supplied with supply cable and plug 

Pump installation may only be performed by Miele Service. 

NEMA 5-15

 

Machine connections: 

Electrical 

connection 

Standard voltage (2 AC 208V/220-240V 60Hz) 

NOTE: Electrical connection depending on version ordered. 

Washer (EL1) – 2 AC 208V/220-240V 60Hz 

Voltage 

2 AC 208 / 220-240 

Frequency 

Hz 

60 

Rated load 

kW 

4 / 4.4 - 5.2 

Fuse rating 

2 x 30 

Length of supply lead 

78“ 

2000 mm 

Supply lead with plug  

NEMA L6-30P 

Dryer (EL2) – 2AC 208V 60Hz

 

 Voltage 

2 AC 208 

Frequency 

Hz 

60 

Rated load 

kW 

4.84 

Fuse rating 

2 x 30 

Length of supply lead 

78“ 

2000 mm 

Supply lead with plug 

NEMA L6-30P 

Dryer (EL2) – 2AC 220-240V 60Hz

 

 Voltage 

2 AC 220-240 

Frequency 

Hz 

60 

Rated load 

kW 

5.7 

Fuse rating 

2 x 30 

Length of supply lead 

78“ 

2000 mm 

Supply lead with plug 

NEMA L6-30P 

Electrical connection must be in full compliance with national regulations and 
guidelines and with relevant local codes. Similarly, relevant regulations issued 
by power utilities, occupational safety authorities and insurance companies as 
well as good installation practices should be observed throughout. 

Connection to the electrical  supply should only be performed by qualified and 
properly trained persons. 

Connection using a  multi-pole wall lockable  socket(s)  in compliance with 
IEC/EN 60309 and IEC/EN 60947 is recommended in order to simplify electrical 
tests. If machines are hard-wired, a multi-pole main switch must be provided on 
site. Switches with a contact gap of more than 3 mm can be used. These 
include  switches, fuses and contactors (IEC/EN 60947). A wall socket or 
electrical isolator must be easily accessible after installation. 

Reinstallation of the supply point, changes to the equipment or checks on the 
protective conductor, including determination of correct fuse rating, should only 
be performed by a properly trained electrician. 

If necessary, equipotential bonding must be provided in accordance with all 
appropriate national and local regulations. 

Technical datasheet: PWT 6089 E

L

 

Date: Feb-2015 

Page: 9 

Summary of Contents for PWT 6089 EL

Page 1: ...Installation plan Washer dryer stack PWT 6089 EL Electrically Heated en US 13 15 M Nr 10 167 290 00...

Page 2: ...tional Headquarters 9 Independence Way Princeton NJ 08540 Phone Fax www mieleusa com Technical Service Support Nationwide Phone 800 991 9380 Fax 800 220 1348 proservice mieleusa com 800 991 9380 609 4...

Page 3: ...11 3 4 11 3 4 27 1 4 76 27 1 2 14 5 8 15 1 8 52 5 8 17 3 8 43 1 4 76 30 28 5 8 27 1 4 20 7 8 50 3 4 19 1 2 12 3 4 21 1 4 30 27 1 4 43 1 4 27 1 4 27 1 2 PWT 6089 EL measurements in inches 3...

Page 4: ...51 1 8 42 1 4 39 3 8 51 1 8 5 7 8 51 1 8 39 3 8 42 1 4 43 1 4 PWT 6089 EL measurements in inches 4...

Page 5: ...76 3 4 27 1 4 28 14 24 3 4 17 3 8 22 4 43 1 4 27 1 8 1 5 8 2 1 4 PWT 6089 EL measurements in inches 5...

Page 6: ...PWT 6089 EL measurements in millimeters 6...

Page 7: ...PWT 6089 EL measurements in millimeters 7...

Page 8: ...PWT 6089 EL measurements in millimeters 8...

Page 9: ...Length of supply lead 78 2000 mm Supply lead with plug NEMA L6 30P Electrical connection must be in full compliance with national regulations and guidelines and with relevant local codes Similarly rel...

Page 10: ...EL2 must be located in the immediate vicinity of the machine Both must be visible accessible and within easy reach If the electrical isolator Q1 is not in full view of a person performing maintenance...

Page 11: ...nnector for drain hose int diameter x length 7 8 x 1 3 16 22 30 mm Max transient throughput 6 9 l min 26 l min Drain pump head height from floor level 39 3 8 1000 mm Vented drainage required If ventil...

Page 12: ...210 kg Dynamic floor load max 3600 N 3600 N Static floor load max 2850 N 2850 N Dynamic load max 750 N 750 N Drum frequency max 22 Hz 22 Hz Average heat dissipation dependent on ambient room temperatu...

Reviews: