Cold water
(Soft water)
Min. flow pressure
14.5 psi
100 kPa
Max. pressure
145 psi
1000 kPa
Max. throughput
2.9 gal/min
11 l/min
On-site connection thread
¾" external thread
¾" external thread
Length of connection hose
(supplied: 1 connection hose)
61“
1550 mm
Hourly water demand (average for 60°C program) for
standard connection (with hot
and
cold water)
approx. 18.5 gal/h
approx. 70 l/h
If hot water supply is not available add hot water demand to
cold water demand.
Warm
water
(Soft water)
Max. temperature
158°F
70°C
Min. flow pressure
14.5 psi
100 kPa
Max. pressure
145 psi
1000 kPa
Max. throughput
2.9 gal/min
11 l/min
On-site connection thread
¾" external thread
¾" external thread
Length of connection hose
(supplied: 1 connection hose)
61“
1550 mm
Hourly water demand (average for 140°F / 60°C program)
approx. 18.5 gal/hr
approx. 70 l/h
Machine can be connected to a hot water supply line with a
temperature of 158°F (70°C) to max.185°F (85°C). This
requires a separate inlet hose. This additional inlet hose is
available from Miele. The machine must also be
reprogrammed by Miele Service.
If hot water is not available, connect hot water hose to cold
water valve!
Drain
pump
Max. temperature
158°F
70°C
Drain hose(int. diameter)
7/8“
22 [DN 22] mm
On-site hose connector for drain hose
(int. diameter x length)
7/8“ x 1 3/16“
22 × 30 mm
Max. transient throughput
6.9 l/min
26 l/min
Drain pump head height (from floor level)
39 3/8“
1000 mm
Vented drainage required. If ventilation is insufficient, Miele
installation kit, Mat. no. 05238090. Drain manifolds serving
several machines must be of sufficient cross-section.
Vented
Nominal air throughput in vented mode
188 cfm
320 m³/h
Max. permissible pressure loss
0.06 psi
420 Pa
Waste air/gas temperature, max.
176°F
80°C
Connector on machine (int. diameter)
4”
100 mm
Connection pipe provided on site (ext. diameter)
4”
100 mm
Miele adapter, Mat. no. 6595070 (int. diameter 100 mm) for
flexible aluminum ducting and adapter, Mat. no. 915051,
(ext. diameter 110 mm) for connection to standard heat-
resistant plastic pipes supplied.
As relative humidity inside the vent ducting can be as high
as 100%, suitable measures must be taken to prevent a
backflow of condensate into the machine.
Air intake
Standard connection:
=> Air intake from installation site
Min. air intake cross-section
(to prevent draughts in room)
37 in
2
237 cm²
A sufficient supply of fresh air should be ensured to replace
the air extracted.
Fittings
(supplied)
4 × clamps
4 × screws DIN 571 (Ø × length)
1/4“ x 2“
6 × 50 mm
4 × rawl plugs (Ø × length)
5/16“ x 1 9/16“
8 × 40 mm
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be provided
on site.
LP
Technical datasheet: PWT 6089 EL
Date: Feb-2015
Page: 11