Installation and connection
30
Installation requirements
The flatwork ironer must only be set up by a Miele authorised and trained service techni-
cian or an authorised dealer.
This flatwork ironer must be installed in accordance with all relevant regulations and
standards. Local energy supplier regulations must also be observed.
This flatwork ironer must only be operated in a room that has sufficient ventilation and
which is frost-free.
Storage
The following conditions must be observed for transport and storage of the flatwork ironer:
– Ambient temperature: -25 °C to +55 °C
– Humidity: 5 % to 75 %, non-condensing
Operating conditions
In general, the operating conditions of DIN 60204 and EN 60204-1 apply.
– Ambient temperature: +5 °C to +40 °C
– Humidity: 10 % to 85 %
– At +21 °C ambient temperature, the maximum permissible relative humidity is 70 %.
– Maximum height above sea level of location site: 1000 m
The ironer must not be operated in the same room as dry-cleaning equipment using
perchloroethylene or solvents containing CFCs.
Collector motor sparking may convert solvent vapours into hydrochloric acid which can
lead to consequential damage.
Ensure adequate ventilation is present in the room in which the ironer is installed whilst it
is being used.
Installation
The flatwork ironer should be transported to the installation site using a suitable pallet
truck. Do not remove the packaging until right before the appliance is used for the first
time.
This flatwork ironer may only be lifted from the wooden frame or transported with the
side column covers fitted.
During installation, ensure that the clearance next to and behind the machine columns is at
least 600 mm so that the cover panels remain accessible.
The clearance in front of the flatwork ironer must amount to at least 1.5 m to prevent for-
eign materials (furniture, walls) from getting hot. There should be a clearance of at least
1 m above the machine.