background image

1. Before placing large pieces of counterop, apply 

silicone caulk to the top of the cabinet. With help, 

slowly position countertop above mounting surface. 

(Fig.P)

2. Gradually tip the countertop to a horizontal position. 

Be aware of upper cabinets and installed sinks (if 

applicable)

(Fig.P)

3. Once in final position, firmly apply downward-

pressure to seat the tops in the silicone caulk.

4. For large countertop pieces it will be necessary to 

caulk along the outer seam between the underside of 

the countertop and cabinet face. 

(Fig.Q)

Fig. P

Fig. Q

7) Install Larger Countertop Pieces with Seam

Fig. R

Fig. S

Fig. T

Fig. U

1. Using the marks you made in step 2, level the areas 

beneath the countertops seam with wooden shims

(Fig.R)

2. Check for seam evenness (adjust shims if needed) and 

apply an eighth-inch bead of Integra™ between the two

surfaces being seamed together.

 (Fig.S)

3. Tighten the seam by gently tapping in a wooded shim 

between the countertop and the wall 

(Fig.T)

. If there is no wall 

at the end of the countertop piece, it will be necessary to 

have someone to hold the countertop.

4. Once the two parts of the Integra

 meet in the mixing tip, 

the adhesive has a 10-15 minute working time. The adhesive 

will start to cure after 15 minutes.

5. Once the Integra™ has dried over (10-15min.) use a razor 

blade to scrape off any excess adhesive. 

(Fig.U)

8) Shims and Seaming (If Applicable)

1)   Shims

5)   Integra™ Seam Adhesive & Tips 

1)   Shims

4)   Silicone Sealant

Fig. V

Fig. W

Fig. X

Fig. Y

Fig. Z

1. Before installing splash pieces, dry fit to ensure proper 

placement. Place dime-sized dabs of silicone caulk 

(Fig.4)

 

every 18 inches along the piece of splash. 

(Fig.V)

2. With longer pieces of backsplash it may be necessary 

to place dabs of hot melt glue between the caulk dabs to 

hold in place until the caulk sets up. Set up time on silicone 

is 15-20 minutes. However, hot melt glue will set up within 

minutes, so position in a timely manner. 

(Fig.W)

3. Press firmly back and down against wall and countertop 

until the hot melt sets. With longer pieces, assistance may be 

necessary to hold in place. 

(Fig.X)

4. Apply an even bead of color-matched sealant, 

(Fig.2)

approximately 1/8" along the seam where the countertop and 

splash meet. 

(Fig.Y) 

The color match sealant has a 20 minute 

working time.

5. Use the spray mist 

(Fig.3)

 and spray the included tool to 

help smooth the silicone bead during tooling. 

6. Place the longest beveled edge of the tool

 (Fig.3)

 on the 

horizontal surface and rotate the small tip in the direction of 

the excess to be removed. Tilt the tool towards the splash 

until the short beveled edge of the tool touches the surface 

of the splash. 

7. Using moderate pressure, move the tool along the silicone 

bead. Removal of excess silicone is suggested throughout 

the process for the best performance 

(Fig.Z)

.

9) Side & Backsplash (If Applicable)

4)   Silicone Caulk

2)   Color Match Silicone

3)   Spray Mist with Tool

Fig.4

Fig.1

Fig.5

Fig.4

Fig.2

Fig.3

Summary of Contents for RiverStone Quartz

Page 1: ...e Fig A Be careful RiverStone countertops are heavy 3 The day before installation the tops should be brought into the room they are to be installed in Be sure to allow 24 hours for the countertops to acclimate to room temperature Never install cold quartz countertops Installation kits should always be stored at room temperature to avoid freezing of the caulks and adhesives RiverStone Quartz counte...

Page 2: ...dermount sink within the traced area and butting up to the anchoring posts press down firmly Fig J 7 Attach undermount sink to the anchoring posts with supplied brackets and wing nuts Wait approximately one hour for caulk to set before moving the countertop section for final placement Fig K Fig F 1 Using a shim level up the marked areas that were made in step 2 Apply dime size dabs of silicone cau...

Page 3: ...ing If Applicable 1 Shims 5 Integra Seam Adhesive Tips 1 Shims 4 Silicone Sealant Fig V Fig W Fig X Fig Y Fig Z 1 Before installing splash pieces dry fit to ensure proper placement Place dime sized dabs of silicone caulk Fig 4 every 18 inches along the piece of splash Fig V 2 With longer pieces of backsplash it may be necessary to place dabs of hot melt glue between the caulk dabs to hold in place...

Page 4: ...proper gluing when joints were assembled The rights under this limited warranty are limited to the original purchaser and may not be transferred to subsequent owners THIS LIMITED WARRANTY IS IN LIEU OF ALL OTHER WARRANTIES EXPRESS OR IMPLIED INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE Sellers shall not be liable for any special incidental or consequential damages T...

Page 5: ... RiverStone Quartz is made of 93 quartz and 7 binders due to the high volume of natural stone used to manufacture the quartz there can be some slight pitting that occurs 1mm to 2mm in width and 1mm deep about the size of a pinhead This is an inherent characteristic of quartz and in no way effects the performance of the material General RiverStone Quartz Information For Everything RiverStone Quartz...

Reviews: