DRAWING
REV
-
INS-201004
S
-
SERIES
SHELVING
PAGE
1
1
1
1
1
2
1
2
2
2
2
1
1
1
1
1
1
1
1
2
2
E
N
G
L
IS
H
STEP 3
ADJUST THE BASE FOOT LEVELING SCREW AT 3/4" AND THE UPRIGHT POST LEVELING
SCREW AT 1/2".
IMPORTANT
THE GONDOLA MUST BE LEVELED AND
CORRECTLY ADJUSTED. FAILURE CAN
DO SO MANY CAUSE : SHELVING
COLLAPSE AND PERSONAL INJURY.
NOTE
ENGINEERING MAY SUGGEST THE
USE OF THE ANCHOR FOOT
BRACKETS SECURED WITH
ANCHORS BOLT 1/4" X 2 1/4"L FOR
EACH POST, INTO THE FLOOR.
54"
60"
66"
72"
78"
84"
90"
96"
108"
120"
144"
36"
42"
48"
NOTE
WARNING! USE WITH CARE
IN LOWERING BACK INTO
PLACE. DO NOT DROP!
STEP 4
INSTALL THE MASONITE BACKS AND THE
CROSS-BARS:
1- INSERT THE TEETH OF THE BOTTOM CROSS-BAR
INTO THE LOWER POSITION OF THE UPRIGHT SLOTS.
2-SLIDE IN THE MASONITE BACK 47 5/8" H AND
INSTALL THE INTERMEDIATE CROSS-BAR IN THE
MIDDLE REAR OF THE BACK.
3- INSTALL THE CENTER CROSS-BAR FOR SLIDING IN
THE LAST MASONITE BACK 29 7/8" H AND PLACE THE
TOP CROSS-BAR .
SEE THE GRID OF THE
MASONITE CHART
(PAGE 20).
CENTER CROSS-BAR
(ITEM#13)
TOP CROSS-BAR
(ITEM#12)
SPLICER CROSS-BAR
(ITEM#15)
BOTTOM CROSS-BAR
(ITEM#14)
7
OF
12