DETAIL A
A
DRAWING
REV
-
INS-201004
S
SERIES
SHELVING
PAGE
E
N
G
L
IS
H
ITEM#11
ITEM#9
ITEM#13
ITEM#10
ITEM#2
ITEM#3
CHALK LINE
BASE SHOE
LATCH
POST
STEP 1
TRACE A CHALK LINE ON THE FLOOR FOR DESIRED LOCATION OF GONDOLA AND LAY
DOWN THE FEET (ITEM#1), POSTS (UPRIGHT) (ITEM#2), OPEN KICK PLATE (ITEM#9) AND
THE CROSS-BARS (ITEM#10-11-13) ALONG THE CHALK LINE.
STEP 2
INSTALL THE BASE SHOE AT THE BOTTOM OF THE POST (UPRIGHT). INSERT THE TEETH
INTO THE SLOTS AND GIVE A PRESSURE BY PUSHING DOWN THE SHOE UNTIL THE
LOCK AND THE LATCH ARE ENGAGED.
IMPORTANT
SHELVING CAN COLLAPSE
IF THE BASE BRACKETS
ARE NOT PROPERLY
INSTALLED AND LOCKED.
BASE SHOE
LOCK
5
OF
12