Push the CTRL Button, Turn the Select knob to show 01 AC In Control, Press the Select knob to Edit 01. 
Scroll the select knob to select “Auto Connect” and press the select knob again. 
 
Push the CTRL Button, Turn the Select knob to show 04 RTR Aux Relay. 
Set to “Auto VDC” (push-push-rotate) 
 
 
Press the SETUP Button, Turn the Select knob to put the arrow on 01 SYSTEM SETUP and press the 
select knob to enter the SYSTEM menus. To set the menu items scroll to the menu item you need to edit 
and press the Select knob. Scroll the select knob to change the value and press the select knob to go back 
to the menus.  
 
Then rotate to: 
01F RTR Aux Relay 
        Set Open VOLTS = 29.0 
        Set Close VOLTS = 26.4 
        Set Open DELAY = 1 
        Set Close DELAY = 10 

 
READ Appendix D – Using the ME-RTR in an AC Coupled Application in the ME-RTR Manual.

 

 
 
Now press the SETUP Button again, Scroll the Select knob to put the arrow on 2 Inverter and press the 
select knob to enter the Inverter menus. To set the menu items scroll to the menu item you need to edit and 
press the Select knob. Scroll the select knob to change the value and press the select knob to go back to 
the menus. 
 
02A - Search Watts (Set this to OFF) 
 
Now press the SETUP  Button again, Scroll the Select knob to put the arrow on 3 Charger and press the 
select knob to enter the Inverter menus. To set the menu items scroll to the menu item you need to edit and 
press the Select knob. Scroll the select knob to change the value and press the select knob to go back to 
the menus. 
 
03A - AC Input Amps (30 amps) 
03C - Battery Type (AGM 1) 
03E - Max Charge rate (20%) 
03F - Final Charge Stage (Float) 
 
That concludes the programming. Now you need to turn the inverter on by pressing the Inverter ON/OFF 
button. Now finish commissioning the system by following the steps below: 
 
*Turn on the AC breaker in the AC Main Panel from the utility (At this point the inverter should connect 
to the grid and the Critical Loads panel should have power) 
*Turn on the Grid tie inverter input breaker and after 5 minutes the grid tie inverter should connect and 
start working, provided the sun is out 

 

 

Summary of Contents for MND3RACCPLME

Page 1: ...Magnum AC Coupled In a D3R battery box MND3RACCPLME 7 22 15...

Page 2: ...other sources of power to the inverter are in the off position Then remove the negative terminal from the battery first To reduce risk of battery explosion follow these instructions and those publish...

Page 3: ...eserved MidNite Solar Inc reserves the right to revise this document and to periodically make changes to the content hereof without obligation or organization of such revisions or changes unless requi...

Page 4: ...rvice on the dwelling Please consult all Local State and federal codes that may apply to this install as well as acquire any permits that may be needed This device is not intended to be relied on for...

Page 5: ...cation to install the Battery box both for wiring as well as stability We recommend if it is to be installed outdoors you try to keep it out of direct sunlight You will need to secure the box using th...

Page 6: ...branch circuit 30 amps or less from the utility Main panel to the buss bars Labeled AC Hot In 2 A 4 wire 120 240VAC circuit from the buss bars labeled AC Out to Critical Loads panel to the sub panel...

Page 7: ...Buss Bars for step 1 this is where the feeder from the utility main panel will connect The first picture shows the common AC Neutral as well as the Earth ground buss bar These 2 buss bars will be use...

Page 8: ...MND3RACCPLME continued 8 P a g e 1 0 2 2 0 1 R E V B Buss bars for Step 2 AC Out to the Critical Loads panel Buss bars for Step 3 AC in from the Grid Tie Inverter...

Page 9: ...MND3RACCPLME continued 9 P a g e 1 0 2 2 0 1 R E V B Below is a wiring diagram showing the AC wiring to be done in the field...

Page 10: ...d as you can see from the picture you simply need to slide the 4 batteries in and connect them in a series string for 24 vdc We are recommending the Concorde PVX3050T 6 volt batteries for this For oth...

Page 11: ...neral use outlet 15 amp AC breaker for the general use outlet This should be on at all times Invert or Bypass Slider Up is Normal and down by passes the Magnum inverter This will normally always be up...

Page 12: ...ter To navigate through the 1 through 3 menus follow the steps below On initial Power up the Router will ask you to set the time To Set the Current Time 1 Turn the Select knob to the hour of day and t...

Page 13: ...knob to enter the Inverter menus To set the menu items scroll to the menu item you need to edit and press the Select knob Scroll the select knob to change the value and press the select knob to go bac...

Page 14: ...and keep an eye on the battery voltage The voltage should rise as the batteries are filled If the loads are too great on the critical load panel it may not rise if this is the case turn some loads of...

Page 15: ...pt for the warranty that the products are made in accordance with the specifications therefore supplied or agreed to by customer MIDNITE SOLAR MAKES NO WARRANTY EXPRESSED OR IMPLIED AND ANY IMPLIED WA...

Reviews: