Pre-Installed Wiring
(Figures 8, 9, 10, & 11)
PV Breaker Trip Wires
(Figures 8 & 9)
1.
Ensure all breakers are off (down).
2.
Raise the
Barcelona’s
terminal block clamp levers (
Figures 8 & 9
,
#1
)
marked “Breaker
Trip
.”
3.
Insert PV trip wires from both PV input breakers into the terminal block (
#1
). The
terminal block has 3 ports, each marked with “+” and “
-
.”
You will use 2 of the 3
terminals. Insert red wire to PV+ terminal; black wire to PV- terminal.
4.
Securely fasten by pushing down on the block clamp levers.
Figure 7
Summary of Contents for Barcelona Breaker Box
Page 1: ...MNBCLNA BB Manual 1 P a g e 1 0 5 6 0 1 R E V Barcelona Breaker Box Owner s Manual ...
Page 18: ...MNBCLNA BB Manual 18 P a g e 1 0 5 6 0 1 R E V ...
Page 19: ...MNBCLNA BB Manual 19 P a g e 1 0 5 6 0 1 R E V ...
Page 20: ...MNBCLNA BB Manual 20 P a g e 1 0 5 6 0 1 R E V ...
Page 21: ...MNBCLNA BB Manual 21 P a g e 1 0 5 6 0 1 R E V ...
Page 22: ...MNBCLNA BB Manual 22 P a g e 1 0 5 6 0 1 R E V ...