75
Ice-blockage
shall
cause
abnormal
operation of system, while copper oxide
shall damage compressor.
Eliminating the non-condensable gas (air)
in system to prevent the components
oxidizing, pressure fluctuation and bad heat
exchange during the operation of system.
12.6.2
Selection of vacuum pump
The ultimate vacuum degree of vacuum
pump shall be -756mmHg or above.
Precision of vacuum pump shall reach
0.02mmHg or above.
12.6.3
Operation procedure for vacuum
drying
Due to different construction environment, two
kinds of vacuum drying ways could be chosen,
namely ordinary vacuum drying and special
vacuum drying.
1
Ordinary vacuum drying
When conduct first vacuum drying,
connect pressure gauge to the infusing
mouth of gas pipe and liquid pipe, and
keep vacuum pump running for 1hour
(vacuum degree of vacuum pump shall be
reached -755mmHg).
If the vacuum degree of vacuum pump
could not reach -755mmHg after 1 hour of
drying, it indicates that there is moisture or
leakage in pipeline system and need to go
on with drying for half an hour.
If the vacuum degree of vacuum pump still
could not reach -755mmHg after 1.5 hours
of drying, check whether there is leakage
source.
Leakage test: After the vacuum degree
reaches -755mmHg, stop vacuum drying
and keep the pressure for 1 hour. If the
indicator of vacuum gauge does not go up,
it is qualified. If going up, it indicates that
there is moisture or leak source.
2
Special vacuum drying
The special vacuum drying method shall be
adopted when:
Finding moisture during flushing refrigerant
pipe.
Conducting construction on rainy day,
because rain water might penetrated into
pipeline.
Construction period is long, and rain water
might penetrated into pipeline.
Rain water might penetrate into pipeline
during construction.
Procedures of special vacuum drying are as
follows:
Vacuum drying for 1 hour.
Vacuum damage, filling nitrogen to reach
0.5Kgf/cm2 .
Because nitrogen is dry gas, vacuum
damage could achieve the effect of
vacuum drying, but this method could not
achieve drying thoroughly when there is
too much moisture. Therefore, special
attention shall be drawn to prevent the
entering of water and the formation of
condensate water.
Vacuum drying again for half an hour.
If the pressure reaches -755mmHg,start
to pressure leakage test. If it cannot reach
the value, repeat vacuum damage and
vacuum drying again for 1 hour.
Leakage test: After the vacuum degree
reaches -755mmHg, stop vacuum drying
and keep the pressure for 1 hour. If the
indicator of vacuum gauge does not go up,
it is qualified. If going up, it indicates that
there is moisture or leak source.
12.7 Additional refrigerant charge
Summary of Contents for MUE-48HRFN1-M
Page 8: ...5 2 2 Part names of Indoor Outdoor units Cassette Unit...
Page 9: ...6 Duct Units...
Page 10: ...7 Console...
Page 11: ...8 Ceiling floor Units...
Page 30: ...27 Console Unit Ceiling floor Units...
Page 34: ...31 CFAU 09HRFN1 M C CFAU 12HRFN1 M C MCD 36HRFN1 M C MCD 48HRFN1 M D...
Page 35: ...32 CTBU 36HWFN1 M C CTBU 48HWFN1 M C...
Page 36: ...33 MUEU 18HRFN1 M C MUEU 24HRFN1 M C MUE 36HRFN1 M C...
Page 37: ...34 MUE 48HRFN1 M C MUE 36HRFN1 M C MUE 48HRFN1 M C...
Page 39: ...36 MOBA30 09HFN1 MT0W MOB30 12HFN1 MT0W...
Page 40: ...37 MOD30 24HFN1 MT0W MOD01 23HFN1 MT0W...
Page 41: ...38 MOD30U 36HFN1 M...
Page 47: ...44 CTBU 09HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 48: ...45 CTBU 12HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 49: ...46 CTBU 18HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 50: ...47 CTBU 24HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 51: ...48 CTB 36HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 52: ...49 CTB 48HWFN1 M C Code 0 Code 1 Code 2 Code 3 Code 4...
Page 61: ...58 12 Field Wiring 36K 48K...
Page 106: ...103 P U P V...
Page 107: ...104 P W P N...
Page 155: ...152 5 Remove the four fixing screws of the fan motor then remove the motor 5...