Service manual
- 18 -
8.5 Pumping down (Re-installation)
Procedure
1. Confirm that both the 2-way and 3-way valves are set to the opened position.
Remove the valve stem caps and confirm that the valve stems are in the opened position.
Be sure to use a hexagonal wrench to operate the valve stems.
2. Operate the unit for 10 to 15 minutes.
3. Stop operation and wait for 3 minutes, then connect the charge set to the service port of the
3-way valve.
Connect the charge hose with the push pin to the gas service port.
4. Air purging of the charge hose.
Open the low-pressure valve on the charge set slightly to purge air from the charge hose.
5. Set the 2-way valve to the close position.
6. Operate the air conditioner at the cooling cycle and stop it when the gauge indicates 0.1MPa.
7. Immediately set the 3-way valve to the closed position.
Do this quickly so that the gauge ends up indicating 0.3 to 0.5Mpa.
8. Disconnect the charge set, and amount the 2-way and 3-way valve’s stem nuts and service
port caps.
Use a torque wrench to tighten the service port cap to a torque of 1.8 kg.m.
Be sure to check for gas leakage.
Summary of Contents for MSG-24CRN2
Page 1: ...MSG 24CRN2 MSG 24HRN2 MSG 30CRN2 MSG 30HRN2...
Page 2: ......
Page 13: ...Service manual 9 5 Refrigerant cycle diagram Cooling only Heat pump mode...
Page 15: ...Service manual 11 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram...
Page 16: ...Service manual 12 7 2 Wiring diagram 7 2 1 Cooling mode MSG 24CR MSG 30CR...
Page 17: ...Service manual 13 7 2 2 Heating mode MSG 24HR MSG 30HR A1 A2...
Page 18: ...Service manual 14 7 2 3 Cooling mode 3 Ph MSG 30CR 3ph...
Page 19: ...Service manual 15 7 2 4 Heating mode 3 Ph MSG 30HR 3ph 1 7 3 4 5 6 2...