B. New built houses and ceilings
a. In the case of new built house, the hook can be embedded in advance (refer to the A.B mentioned
above). But it should be strong enough to bear the indoor unit and will not become loose because
of concrete shrinking.
b. After installing the body, please fasten the installation paper board onto the air conditioner with
bolts(M6
12) to determine in advance the sizes and positions of the hole opening on ceiling.
Please first guarantee the flatness and horizontal of ceiling when installing it.
Refer to the A.a mentioned above for others.
c. Refer to the A.c mentioned above for installation.
d. Remove the installation paper board.
2. Install The Panel
CAUTIONS
CAUTIONS
After completion of installing the body, the four bolts(M6 12)must be fastened to the air
conditioner to ensure the body is grounded well.
Never put the panel face down on floor or against the wall, or on bulgy objects.
Never crash or strike it.
(1) Remove the inlet grid.
a. Slide two grid switches toward the middle at the same time, and then pull them up. (Refer to chart 8)
0
b. Draw the grid up to an angle of about 45 , and remove it. (Refer to chart 9)
Grid switch
Chart 8
45
Chart 9
Chart 10
(2) Remove the installation covers at the four corners.
Wrench off the bolts, loose the rope of the installation covers, and remove them. (Refer to chart 10)
(3) Install the panel
a. Align the swing motor on the panel to the tubing joints of the body properly. ( Refer to chart 11)
b. Fix hooks of the panel at swing motor and its opposite sides to the hooks of corresponding water
receiver. ( Refer to chart 11
) Then hang the other two panel hooks onto corresponding hangers of
the body. ( Refer to chart 11
)
CAUTIONS
Do not coil the wiring of the swing motor into the seal sponge.
7
Summary of Contents for MCA-24CRN2
Page 22: ...A CS0174N ...