Page 13
Ins
tallation
Ins
tructions
7. Secure Lower Sash
8. Check Installation
A: To secure lower sash in place, attach right angle sash
lock with 1/2”(12.7 mm) screw as shown (Fig. 10).
Check that air conditioner is tilted back about 1/4” to 1/2” (tilted about 2° to 4° downward
to the outside, see Fig. 12A & Fig. 12B). After proper installation, condensate, should not
drain from the overflow drain hole during normal use, correct the slope otherwise.
B: Cut foam window seal and insert it into the space
between the upper and lower sashes (Fig. 11).
Fig. 12A
Fig. 12B
Fig. 12A
Wooden Window
E
D
I
S
T
U
O
E
D
I
S
N
I
INSIDE
about
Bottom Rail
Vinyl-Clad Window
Bottom Rail
OUTSIDE
H1
H
Fig. 12B
H
H
Fig. 11
FOAM SEAL
Fig. 10
Fig. 11
Summary of Contents for MAW08HV1CWT
Page 61: ...Page 61...
Page 62: ......