Service manual
26
8.6
Re-air purging (Re-installation)
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the closed position.
2. Connect the charge set and a charging cylinder to the service port of the 3-way valve.
Leave the valve on the charging cylinder closed.
3. Air purging.
Open the valves on the charging cylinder and the charge set. Purge the air by loosening the flare nut
on the 2-way valve approximately 45’ for 3 seconds then closing it for 1 minutes; repeat 3 times.
After purging the air, use a torque wrench to tighten the flare nut to on the 2-way valve.
4. Check the gas leakage.
Check the flare connections for gas leakage.
5. Discharge the refrigerant.
Close the valve on the charging cylinder and discharge the refrigerant until the gauge indicate 0.3 to
0.5 Mpa.
6. Disconnect the charge set and the charging cylinder, and set the 2-way and 3-way valves to
the open position.
Be sure to use a hexagonal wrench to operate the valve stems.
7. Mount the valve stems nuts and the service port cap.
Be sure to use a torque wrench to tighten the service port cap to a torque 18N.m.
Be sure to check the gas leakage.
Summary of Contents for AAC-18ISCH
Page 4: ......
Page 16: ...Service manual 12 5 Refrigerant cycle diagram...
Page 20: ...Service manual 16 7 1 5 Indoor main PCB Inverter Eco...
Page 21: ...Service manual 17 7 1 6 Outdoor main PCB Inverter Eco...
Page 22: ...Service manual 18 7 2 Wiring diagram 7 2 1 MSH 18HRDN1...
Page 23: ...Service manual 19 7 2 2 MSC 18HRIN1...
Page 24: ...Service manual 20 7 2 3 MSE 09HRIN2 MSE 12HRIN2...