INSTALLATION AND OPERATION MANUAL, GAS FIRED STEAMER, MODELS GCX-2, GCX-10
PART NUMBER 10056R3
21
2009-03-24
CLEANING
(Continued)
3.
Remove drain screens from inside compartment drains. Using a plastic bottle brush and
mild detergent, clean inside the drain opening ensuring there is no food residue or
blockage. Clean the drain screen and replace in its original position.
4.
Wash gasket sealing surface daily with mild detergent to remove harmful food acids.
5.
Clean around burner air mixer and orifice if lint has accumulated.
6.
Visually assure carry over ports are unobstructed.
7.
Rinse entire unit and dry.
DO NOT GET WATER
in electrical box or any electrical
component.
7.0 ADJUSTMENTS
At least twice a year have an authorized service person clean and adjust the unit for maximum
performance.
BOILER DESCALING INSTRUCTIONS
It is recommended that the boiler should be checked every 90 to 120 days for scale build up.
Regular maintenance should be carried out at this time.
If the boiler has been descaled, a new Anode should be installed in the boiler to help extend its
life.
1.
With boiler empty, close manual blowdown valve. If appliance is equipped with automatic
blowdown, turn water supply OFF to appliance. Turn power switch ON. This will energize
and close blowdown valve.
2.
Remove 3/4" pipe plug from fitting on left front of boiler.
3.
Insert appropriate hose or tube through fitting and pour in (½) half gallon (U.S.) of CLR
Descaling Solution or use the Optional Deliming Assembly DPA-1 available from your
dealer.
For appliances equipped with CSD-1, descaling solution must be introduced through hand
hole.
4.
Replace 3/4" pipe plug securely.