INSTALLATION AND OPERATION MANUAL, GAS FIRED STEAMER, MODELS GCX-2, GCX-10
PART NUMBER 10056R3
14
2009-03-24
4.0 OPERATION INSTRUCTIONS FOR BOILERS WITH CSD-1 CONTROLS
WARNING: In the event of main burner ignition failure, a 5 minute
purge period must be observed prior to re-establishing ignition
source.
INITIAL START-UP PROCEDURE
1.
Open the manual gas shut-off supply valve.
2.
Close the manual blowdown valve, if so equipped.
3.
Light the pilot burner.
The dial on the gas combination valve has three positions (ON - OFF - PILOT) for manual
gas control of main burners and pilot burner. Turn the dial on the gas combination valve to
“PILOT”, depress the dial and light the pilot burner on the centre burner. Maintain the dial
in depressed position for about 30 seconds and release. Observe the pilot flame stays
ON. Turn dial to “ON”.
If at any time the flame should become extinguished, a five (5) minute purging is
required before relighting is attempted.
4.
Open cabinet door and turn “ON” the power switch.
The green pilot light will come “ON”. Water should begin to enter the boiler. When enough
water has entered the boiler the (amber) “STANDBY” pilot light will come on.
5.
Press the “RESET” switch to begin boiler operation.
The “STANDBY” pilot light will go off and the boiler will begin operation.