CT-8750 User’s Guide
P 34
Chapter III
Sequence Test Setup
Sequence test was designed by software programming to test DUT by multiple
test condition (setup) to complete the auto test in single routine by pressing just
one button. It saves time and effort effectively in mass production lines. It
includes three sessions.
Test Condition Setup
Run The Sequence Test
File Management
III.1
Test Condition Setup
Test conditions setup are defined to setup the test signals, control limits, and
necessary items before preceding the sequence test routine. That includes O/S
/ Cond /RLC/HV …setup.
The signs of test parameter (Frequency, voltage and Current)
Control standard. specification standard and tolerate percentage
III.1.A
Open/ Short
Operation Procedure
(a)
Press [O/S]
(b)
LCD display as following
(c)
Open/Short list is from learning
(d)
Complete it then press [Exit] to leave