Video Wall Installation Manual – 6WX1H
Page 9
Rev. 09/2019
Step 2 –Inserting Square Nuts into rails
Instructions
Diagrams
•
Find a flat surface area, ideally on floor,
to build the entire frame structure.
•
If mount will be used with monitors having
screen size of 55”or greater the Top and
Bottom rails have been cut in half to make
shipping easier.
•
Join the 2 sections of Top Rails together as
shown in figure 2A using 4mm Allen
wrench.
•
Repeat for the Bottom Rails.
Fig. 2A
•
With each Top and Bottom Rail, slide
the Square Nut (Part N) into bottom t-
slot for each rail supplied. See figures
2A and 2B.
•
Insert the following number of Square
Nuts into each top and bottom rail as
indicated below:
Model
Top Rail
Bottom Rail
6W x 1H
3
1
•
The Square Nuts will be loose inside the
rail for time being.
Fig. 2A Fig. 2B