8
9.
Carefully re-align sprockets, if necessary and secure keyway and set screws.
10.
(For PRO-H models):
Install hand chain by wrapping it through chain guard holes and pocket wheel. Allow chain
to hang down towards floor. Cut chain and connect so that chain is 2’ to 3’ from the floor.
11.
Install chain keeper to wall near hand chain at approximately 4’ from floor. Run disconnect chain through keyhole
of chain keeper and cut excess chain links if required. Attach keyring to end of disconnect chain.
12.
If an
optional
floor level disconnect lever was ordered in lieu of the chain keeper, mount to wall with suitable
hardware. Attach both chains together using keyring provided. Allow disconnect chain to be slightly slack when
lever is in the up position.
Summary of Contents for PRO-H
Page 1: ...INSTALLATION AND INSTRUCTION MANUAL MODELS PRO J PRO H AUG 2010 ...
Page 2: ......
Page 3: ......
Page 32: ...30 ...
Page 34: ...32 ...
Page 36: ... ...
Page 37: ... ...
Page 38: ...36 ...
Page 39: ...37 ...
Page 40: ... ...
Page 41: ... ...
Page 42: ...40 ...
Page 43: ...41 ...
Page 44: ...NOTES ...
Page 45: ...NOTES ...
Page 46: ...NOTES ...
Page 47: ...NOTES ...