© MHG Heating Ltd
4
MHG Heating Ltd, Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR
0845 6448802 Telephone. 0845 6448803 Fax. Email
Website www.mhgheating.co.uk
010310 Draft
2.0 Installation Regulations and Requirements
The installation of
EcoStar 500
boilers must be in accordance with the relevant requirements of Gas
Safety (Installation & Use) Regulations 1994, Health & Safety at Work Act, Building Regulations, IEE
Regulations, Construction (Design & Management) Regulations 1994, Local Authority Bye-Laws,
National, Fire Regulations and Insurance Company requirements.
The following Codes of Practice are also applicable:-
BS 5440-1: 2000 Installation of flues and ventilation for gas appliances of rated input not exceeding 70
kW net (1st, 2nd and 3rd family gases).
Part 1: Specification for the installation of flues.
BS 5440-2: 2000 Installation of flues and ventilation for gas appliances of rated input not exceeding 70
kW net (1st, 2nd and 3rd family gases).
Part 2: Specification for installation and maintenance of ventilation for gas appliances.
BS 5449: 1990 Specification for forced circulation hot water central heating systems for domestic
premises.
BS 6644: 2005 Specification for gas fired hot water boilers of rated inputs between 70kW (net) and
1.8MW(net) (2nd and 3rd family gases).
BS 6798: 1987 Specification for installation of gas fired hot water boilers of rated input not exceeding
60 kW.
BS 6880: 1988 Code of Practice for low temperature hot water heating systems of output greater than
45kW. Parts 1, 2 & 3.
BS 6891: 1988 Specification for installation of low pressure gas pipework of up to 28mm (R1) in
domestic premises (2nd family gases)
BS 7593: 1992 Code of Practice for treatment of water in domestic hot water central heating systems.
BS 7671: 1992 Requirements for electrical installations. IEE Wiring Regulations. Sixteenth edition.
CISBE Guide reference sections B7, B11 and B13.
CP342 Part 2: 1974 Code of Practice for centralized hot water supply.
IGE/UP/2 Gas installation pipework, boosters and compressors on industrial and commercial premises.
IGE/UP/4 Commissioning of gas fired plant on industrial and commercial premises
IGE/UP/10 Installation of gas appliances in industrial and commercial premises. Part 1: Flued
appliances.
And any addition prevailing regulation and or code of practice not detailed above.